Alpha HE CB25/33, SY25 - Benchmark Checklist
12
CHECKLIST
Ensure the following is completed after the boiler has been installed and commissioned:-
BOILER SERIAL No. ......................................................... NOTIFICATION No. ..........................................................
CONTROLS
To comply with the Building Regulations, each section must have a tick in one or other of the boxes
Time & temperature control to heating
Time & temperature control to hot water
Heating zone valves
Hot water zone valves
Thermostatic radiator valves
Automatic by-pass to system
FOR ALL BOILERS CONFIRM THE FOLLOWING:
The system has been flushed in accordance with the boiler manufacturer's instructions?
Yes
No
The system cleaner used ....................................................................................................................
The inhibitor used ................................................................................................................................
FOR CENTRAL HEATING MODE, MEASURE AND RECORD THE FOLLOWING:
Gas rate
m³/hr
ft³/hr
Burner operating pressure (if applicable)
N/A
mbar
Central heating flow temperature
°C
Central heating return temperature
°C
FOR COMBINATION BOILERS ONLY
Has a water scale reducer been fitted?
Yes
No
What type of scale reducer has been fitted? ......................................................................................
FOR DOMESTIC HOT WATER MODE, MEASURE AND RECORD THE FOLLOWING:
Gas rate
m³/hr
ft³/hr
Maximum burner operating pressure (if applicable)
N/A
mbar
Cold water inlet temperature
°C
Hot water outlet temperature
°C
Water flow rate
lts/min
FOR CONDENSING BOILERS ONLY CONFIRM THE FOLLOWING:
The condensate drain has been installed in accordance with the manufacturer's instructions?
Yes
FOR ALL INSTALLATIONS CONFIRM THE FOLLOWING:
The heating and hot water system complies with current Building Regulations
Yes
The appliance and associated equipment has been installed and commissioned
in accordance with the manufacturer's instructions
Yes
If required by the manufacturer, have you recorded a CO/CO
2
ratio reading
N/A
Yes
CO/CO
2
ratio
The operation of the appliance and system controls have been demonstrated to the customer
Yes
The manufacturer's literature has been left with the customer
Yes
COMMISSIONING ENG'S NAME:
Print ...................................................................... CORGI ID No. ..................................................
Sign ...................................................................... Date .................................................................
room t/stat & programmer/timer
cylinder t/stat & programmer/timer
Fitted
Fitted
Fitted
Fitted
Programmable roomstat
Combi boiler
Not required
Not required
Not required
Содержание Alpha HE CB25
Страница 33: ...33 9 1 HE CB25 33 ILLUSTRATED WIRING DIAGRAM Alpha HE CB25 33 SY25 Wiring Diagrams 9 WIRING DIAGRAMS...
Страница 34: ...34 Alpha HE CB25 33 SY25 Wiring Diagrams 9 2 HE SY25 ILLUSTRATED WIRING DIAGRAM...
Страница 35: ...35 9 3 HE CB25 33 FUNCTIONAL FLOW WIRING DIAGRAM Alpha HE CB25 33 SY25 Wiring Diagrams...
Страница 36: ...36 9 4 HE SY25 FUNCTIONAL FLOW WIRING DIAGRAM Alpha HE CB25 33 SY25 Wiring Diagrams...
Страница 38: ...38 Alpha HE CB25 33 SY25 Fault Finding 10 3 DOMESTIC HOT WATER HE CB25 33 only Follow operational sequence...
Страница 39: ...39 Alpha HE CB25 33 SY25 Fault Finding 10 4 FAULT FINDING SOLUTIONS A to F...
Страница 40: ...40 Alpha HE CB25 33 SY25 Fault Finding 10 5 FAULT FINDING SOLUTION SECTIONS G to J...
Страница 41: ...41 Alpha HE CB25 33 SY25 Fault Finding 10 6 FAULT FINDING SOLUTION SECTIONS K to L...