![Alpha Alpha HE CB25 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/alpha/alpha-he-cb25/alpha-he-cb25_installation-and-servicing-instructions_2905134016.webp)
16
2.
Determine the overall length (L) of flue required, (see Fig. 16) as follows:-
Rear flue
L = wall thickness (B) + 170 mm
Side flue
L = wall thickness (B) + distance between boiler and wall (C) + 230 mm
Fig. 16
3.
Adjust the telescopic section of the flue to the distance 'L', ensuring that the two labels marked 'TOP' are aligned, then seal
and secure the joint between the ducts with the sealing tape supplied.
4.
Pass the flue assembly through the wall (from inside or outside).
Note: Internal fitting -
If there is no access to make good the outside wall, locate the flue sealing collar onto the outer duct
of the flue immediately before the terminal grille onto the location provided. Push the flue assembly through the 130 mm flue
hole, so that the collar completely passes through the wall. Then pull the flue assembly back into the correct position. Visually
check that the collar is sealing the outside wall and that it is not restricting any of the openings of the flue terminal.
5.
Position the seal and clamp (two screws) supplied, over the bend. Fit the bend to the boiler and rotate to the correct position.
Secure in position using the seal and clamp, ensuring the seal is located centrally over both the bend and boiler adaptor.
4.6
FIT THE FLUE - Figs. 14, 15
The following procedure applies to fitting an Alpha CD Easy-Flue to both rear or side exit flue - horizontally only.
1.
The CD Easy-Flues are suitable for use in the flue length ranges shown in the tables below.
Note:
Where the length is less than the minimum or more than the maximum, refer to Section 4.7.
Alpha HE CB25/33, SY25 - Installation
Fig. 14
Fig. 15
CD Easy-Flue
500 mm
1000 mm
B (mm)
Max
520
915
Min
280
675
CD Easy-Flue
500 mm
1000 mm
Max
460
855
Min
220
615
B + C (mm)
A
- Heating flow (22 mm)
C
- Gas inlet (22 mm)
E
- Heating return (22 mm)
F
- Pressure relief valve (15 mm)
G
- Heating drain point
I
- Condensate discharge pipe
G
I
Condensate
trap
23
70
212.5
70
50
47.5
C
F
E
A
!
"
$
#
!
"
!
"!
"
!
"
Fig. 13b - HE SY25
Содержание Alpha HE CB25
Страница 33: ...33 9 1 HE CB25 33 ILLUSTRATED WIRING DIAGRAM Alpha HE CB25 33 SY25 Wiring Diagrams 9 WIRING DIAGRAMS...
Страница 34: ...34 Alpha HE CB25 33 SY25 Wiring Diagrams 9 2 HE SY25 ILLUSTRATED WIRING DIAGRAM...
Страница 35: ...35 9 3 HE CB25 33 FUNCTIONAL FLOW WIRING DIAGRAM Alpha HE CB25 33 SY25 Wiring Diagrams...
Страница 36: ...36 9 4 HE SY25 FUNCTIONAL FLOW WIRING DIAGRAM Alpha HE CB25 33 SY25 Wiring Diagrams...
Страница 38: ...38 Alpha HE CB25 33 SY25 Fault Finding 10 3 DOMESTIC HOT WATER HE CB25 33 only Follow operational sequence...
Страница 39: ...39 Alpha HE CB25 33 SY25 Fault Finding 10 4 FAULT FINDING SOLUTIONS A to F...
Страница 40: ...40 Alpha HE CB25 33 SY25 Fault Finding 10 5 FAULT FINDING SOLUTION SECTIONS G to J...
Страница 41: ...41 Alpha HE CB25 33 SY25 Fault Finding 10 6 FAULT FINDING SOLUTION SECTIONS K to L...