8.12 INTERNAL FUSE - Refer to Fig. 14
The fuse is located in the boiler terminal block.
1.
Gain access as described in Installation, section 4.8.
2.
Lift out the fuse holder and remove the fuse. Fit a fast blow 2 A fuse as a replacement, ensuring that the holder snaps into position.
3.
Re-assemble in reverse order, ensuring the terminal block is located correctly on the plastic pins.
8.13 PCB - Fig. 22
1.
Gain access behind the control panel as described in section 8.1.
2.
Disconnect all the wiring connectors from the PCB.
3.
Remove the five fixing screws and carefully withdraw the board from the switch spindles.
4.
Re-assemble in reverse order. Refer to the wiring diagram in section 9.1 for connections.
Alpha CB24/28 - Component Replacement
Fig. 22
Fig. 23
8.14 DHW FLOW SWITCH - Fig. 23
1.
Gain access behind the casing as described in section 8.1.
2.
Remove the switch from the diverter valve by pulling or prising it upwards from the valve body. Disconnect the inline wiring
connector. Re-assemble in reverse order with a new switch. Ensure that the switch is located correctly.
8.15 CLOCK (if fitted) - Refer to Fig. 15
1.
Gain access behind the control panel as described in section 8.1.
2.
Remove the two screws securing the clock cover at the rear of the control panel.
3.
Disconnect the wiring from the clock.
4.
Remove the clock retaining screws and withdraw the clock from the control panel.
5.
Fit the new clock, and connect the wires as follows:-
Blue to terminal 1, Brown to terminal 2 and Red wires to terminals 3 and 4, (or as per the instructions supplied with the clock).
6.
Re-assemble in reverse order. Refer to the User's instructions and the boiler's control cover to set the clock.
8.16 PRIMARY HEAT EXCHANGER
1.
Gain access to the combustion chamber and drain the boiler heating circuit as described in sections 8.1 and 8.2.
2.
Remove the four screws securing the combustion chamber front cover and remove the cover.
3.
Remove the overheat thermostat (section 8.9) and the CH temperature sensor (section 8.19).
4.
Remove the right hand side baffle plate by lifting it up.
5.
Disconnect the two unions from the heat exchanger flow and return pipes.
6.
Lift up the heat exchanger off the pipes and remove it by carefully withdrawing it out of the boiler.
7.
Carefully prise off the two clips and remove the flow and return pipes from the heat exchanger.
8.
Fit the flow and return pipes to the new heat exchanger, ensuring the new 'O' rings are in position in the flanges.
Lubricating the 'O' rings with a soap solution will aid assembly. Ensure the heat exchanger is correctly located.
9.
Re-assemble in reverse order.
10. Refill and pressurise the system. (Refer to Commissioning, section 5.1).
Содержание Alpha CB24
Страница 27: ...27 9 1 ILLUSTRATED WIRING DIAGRAM Alpha CB24 28 Wiring Diagrams 9 WIRING DIAGRAMS...
Страница 28: ...28 Alpha CB24 28 Wiring Diagrams 9 2 FUNCTIONAL FLOW WIRING DIAGRAM...
Страница 30: ...30 Alpha CB24 28 Fault Finding 10 3 DOMESTIC HOT WATER Follow operational sequence...
Страница 31: ...31 Alpha CB24 28 Fault Finding 10 4 FAULT FINDING SOLUTIONS A to F...
Страница 32: ...32 Alpha CB24 28 Fault Finding 10 5 FAULT FINDING SOLUTION SECTIONS G to L...
Страница 35: ...35 Alpha CB24 28...