9
HORIZONTAL FLUE OPTIONS - L
max
= 12 metres
L = B + C + E + 200 mm
Alpha CD13R, 18R, 24R - General Boiler Information
L = B + C + 200 mm
L = B + E + F + 200 mm + (90° bend = 1.3 metre)
L = B + C + 200 mm + (2 x 45° bends = 1.8 metre)
Fig. 2.4
VERTICAL FLUE OPTIONS
Not less than
300 mm
H
Not less than
300 mm
H
C
B
E
C
B
E
B
F
C
B
Содержание 41 532 03
Страница 37: ...37 Alpha CD13R 18R 24R Fault Finding 10 3 FAULT FINDING SOLUTIONS F to I ...
Страница 48: ...4 Alpha CD13R 18R 24R ...