Ideally, the device should be transported with a lift 

truck.

 

Do not tilt the heat pump by more than 45°.

Transport with a crane

≈730kg 

≈730kg 

Variant 1

Variant 2

Appropriate lifting equipment with a load capacity cor-

responding to the weight of the unit must be available 

on site.

This includes:

 

4 slings 

with sufficient load capacity

 (length per item

 ≥ 4 m)

 

steel tubes with sufficient load capacity

 (length per item

 1.1 m, Ø ≤ 35 mm)

1.  Slide the steel tubes left and right through the side 

holes of the packed device base.

2.  Hook the slings into the steel tubes and secure 

them against slipping.

The slings must be attached so that the device 

cannot tilt!

3.  Lift the unit with the crane and place it on the 

base.

4.  Make sure that the unit's base frame is in full con-

tact with the base.

Transport with a pallet truck

 

Transport the device to the installation site whilst 

still packaged.

Unpacking

1. 

Remove  plastic  films.  Ensure  that  you  do  not 

damage the device.

2.  Dispose of the transport and packaging material 

in an environmentally friendly way and in 

accordance with local regulations.

5.4  Installation

Set-up and connection

 CAUTION!

In the air outlet area, the air temperature is 

approx. 5° K below the ambient temperature. 

Under certain climatic conditions, an ice 

layer can therefore form in the air outlet area. 

Install the heat pump such that the air blower 

does not discharge into footpath areas.

 NOTE

Always refer to and follow the installation plan 

for the respective model. Note the size and 

minimum clearances.

  “Installation plans", from page 23

 NOTE.

Install the unit so that the switch box side (= 

control side) is accessible at all times.

Requirements for the installation location

 

Only erect in outdoor areas

 

Clearance dimensions are met.

 

 

“Installation plans", from page 23

 

Free air output and intake is possible without 

forming an air short-circuit.

 

The surface/floor is suitable for installation of the 

unit:

 

level and horizontal

 

load-bearing capacity for the unit's weight

 

Fit anti-slip mats in accordance with the 

installation plan

 

 

“Installation plans", from page 23

Содержание LWP 450-LUX

Страница 1: ...UK 83059700iUK Translation of the original operating manual Air water heat pumps Operating Manual LWP...

Страница 2: ...installation 11 8 Flushing filling and venting 12 8 1 Heating water quality 12 8 2 Flushing filling and venting the heating circuit 12 9 Insulate hydraulic connections 13 10 Set the overflow valve 13...

Страница 3: ...draulic integration Operating manual of the heating and heat pump controller Brief description of the heat pump controller Operating manual of the expansion board Log book 1 3 Symbols and markings Ide...

Страница 4: ...uries and damage to property Ensure that personnel are familiar with local regulations especially those on safe and hazard aware working Allow qualified personnel with electrical training only to carr...

Страница 5: ...stems Proper planning design and commissioning Closed system with regard to corrosion Integration of an adequately dimensioned pressure maintaining device Use of demineralised heating water or VDI 203...

Страница 6: ...ipes Transport with a crane page 9 2 Cut outs for transport with a forklift ATTENTION Only transport the unit to the installation location in its original packaging 3 2 Layout NOTE This section essent...

Страница 7: ...is used in the heating circuit The liquid refrigerant at a high pressure and high temperature is depressurised expansion valve The pressure and temperature drop and the process begins again The heate...

Страница 8: ...There is a risk of cutting your hands on sharp edges of the device Wear cut resistant protective gloves The hydraulic connections are not designed for mechanical loads Do not lift or transport the dev...

Страница 9: ...packaged Unpacking 1 Remove plastic films Ensure that you do not damage the device 2 Dispose of the transport and packaging material in an environmentally friendly way and in accordance with local reg...

Страница 10: ...e adequately dimensioned The connection line between the heat pump and the building must also be taken into account 9 9 Dimension the recirculating pump and piping system such that the required throug...

Страница 11: ...the ground to a depth of at least 90 cm If the condensate is discharged into the sewer system ensure frost free laying with a gradient Discharge of the condensate into the sewers is permitted only via...

Страница 12: ...the heat pump 8 Flushing filling and venting 8 1 Heating water quality NOTE For detailed information refer among other things to the VDI Guidelines 2035 Vermeidung von Sch den in Warmwasserheizanlage...

Страница 13: ...necessary for the integration of storage tanks in series Complete the work steps quickly otherwise the maximum return temperature may be exceeded and the heat pump switches to high pressure fault Turn...

Страница 14: ...e manufacturer s factory customer service department In other countries Send notice of completion for heat pump systems and rough checklist to the manufacturer s local partner 4 Arrange for the heat p...

Страница 15: ...ing product Neutralise any residues and flush the condenser thoroughly with water 12 4 Yearly maintenance Record the quality of the heating water analytically In case of deviations from the specificat...

Страница 16: ...16 Subject to technical amendments without notice 83059700iUK Translation of the original operating manual ait deutschland GmbH...

Страница 17: ...h Hot gas use Flow rate pipe dimensioning l h 2000 Free pressing Pressure loss Flow rate bar bar l h 0 952 0 045 2000 General unit data Total weight kg 680 Weight of individual components kg kg kg Ref...

Страница 18: ...ungszahl maximale freie Pressung W rmepumpe 10 15 20 25 30 35 40 45 50 55 60 65 70 75 22 17 12 7 2 3 8 13 18 23 28 33 Temp C Qh kW 35 C 1VD 55 C 1VD 35 C 2VD 55 C 2VD 1 2 3 4 5 6 22 17 12 7 2 3 8 13 1...

Страница 19: ...9 2017 VD R cklauf 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 15 20 25 30 35 40 Temp C Q0 kW 7 C 1VD 18 C 1VD 10 C 2VD 18 C 2VD 1 2 3 4 5 6 15 20 25 3...

Страница 20: ...3 0 3 5 GH m h p bar p1 0 5 10 15 20 25 30 35 40 45 50 55 60 25 30 35 40 45 50 55 60 65 Q hg TempHG C Hz A7 35 C 1VD 55 C 1VD 0 5 10 15 20 25 30 35 40 45 50 55 60 25 30 35 40 45 50 55 60 65 Q hg TempH...

Страница 21: ...21 Subject to technical amendments without notice 83059700iUK Translation of the original operating manual ait deutschland GmbH...

Страница 22: ...212 197 362 327 0 135 245 335 195 Z 1 10 FB 1 0 132 497 682 928 778 0 160 296 475 Y 1 10 7 6 9 8 6 5 4 3 2 1 www ait deutschland D 95359 Kasend Industriestra e 3 ait deutschland Gm A B C D E F 4 3 2...

Страница 23: ...17 M 034 2019 Kondensatablauf Datum 25 10 1 11 07 1 05 04 1 Blattformat A3 quer Installation plan base plan LWP Pos Name 1 Hot water outlet supply flow DN 50 insulation 2 Hot water inlet return flow D...

Страница 24: ...K Translation of the original operating manual ait deutschland GmbH 1000 4000 4000 1000 4000 Mindestabst nde in mm zu Geb uden oder W rmepumpen 4 3 2 1 A B C D E F 4 3 2 1 b a Zust a b Minimum clearan...

Страница 25: ...3400 4000 4000 1800 1000 1800 1000 1800 1000 1800 850 12200 8850 1000 1000 4000 4000 luftseitig bevorzugte Aufstellvariante Kaskadenaufstellung 4 Ger te Mindestabst nde in mm zu Geb uden 4 3 2 1 A B C...

Страница 26: ...at the condensed water is routed in such a way as to be protected from frost 0 9m KS 3 0 9m 3 3 Legende 819492b Technische nderungen vorbehalten Aufstellungshinweise f r Anschluss der Kondensatleitung...

Страница 27: ...t the condensate is discharged frost free in all cases figure 2a 2a 2b Legende 819492b Technische nerungen vorbehalten Aufstellungshinweise f r Anschluss der Kondensatleitung innerhalb des Geb udes Wi...

Страница 28: ...bH LWP with multifunction tank as domestic hot water tank Heating 3 3 31 31 5 5 7 24 16 104 A TA A B A B 26 BUP 51 G TRL 2 2 11 11 8 8 8 8 10 10 8 8 STA D 15 9 HUP 21 FP1 MK1 C TB1 16 B TBW 111 TEH 8...

Страница 29: ...5 5 7 24 16 8 8 10 Ent 2 11 8 8 10 8 D 15 21 FP1 MK1 C TB1 16 C TB2 T 103 T 102 60 FP3 60 FP3 66 11 8 8 10 8 9 HUP T 102 AB A B A B B A 8 5 10 23 ZUP 8 10 23 ZUP 5 8 10 64 FP2 AB B A 60 FP2 20 ZWE 1 B...

Страница 30: ...rt trap 0 6 mm mesh 15 Mixer circuit three way mixer MK2 3 discharge 30 Spill tray f r brine mix 100 Room thermostat for cooling optional 17 Temperature difference regulator 31 Wall breakthrough 101 C...

Страница 31: ...closed Charge discharge cooling mixer 1 open Auxiliary circulation pump Diverting valve for domestic hot water Heating circuit circulating pump Pump for mixing circuit 1 Energy supplier contact closed...

Страница 32: ...stallation Hot water or buffer storage tank Cut out auxiliary heating Contactor for auxiliary heating Control signal of additional heat generator 1 831224a 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E...

Страница 33: ...230V 5A floating contact GND MA2 MZ2 Swimming pool thermostat FP3 analogue output 2 0 10V TFB2 Pump mixing circuit 2 dry contact ZW3 AIN 21 AIN 21 OUT 24 NTC 25 MZ3 A0 22 Sensor mixing circuit 3 AIN...

Страница 34: ...jection Compressor 2 817422c Q1 1 E1 0 R20 Q2 0 Q2 1 Q2 2 3 M2 Y2 0 Q2 1 E2 0 R21 X7 Q0 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 1 4 3 4 5 6 7 AIT 817422 Stromlaufplan ait deutschland Gm...

Страница 35: ...ction fan 817422c Q3 0 3 M3 E3 0 K1 0 3 M4 B1 E4 0 K2 0 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 2 4 3 4 5 6 7 AIT 817422 Stromlaufplan ait deutschland GmbH M999 2018 M999 2018 M999 2018...

Страница 36: ...ressor 1 Terminal in switch box heat pump 817422c Q1 1 K1 0 Q2 1 K21 K2 0 K22 K20 X10 XM 1 M5 C5 X4 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 3 4 3 4 5 6 7 AIT 817422 Stromlaufplan ait de...

Страница 37: ...sensor 20 5kOhm 20 5kOhm R3 817422c R4 Encoding resistor Encoding resistor R5 R6 R7 R8 R10 B10 X8 B11 X20 X11 X3 X2 X1 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 4 4 3 4 5 6 7 AIT 817422...

Страница 38: ...38 Subject to technical amendments without notice 83059700iUK Translation of the original operating manual ait deutschland GmbH...

Страница 39: ...N 60335 1 2 40 EN ISO 13857 EN 61000 3 2 3 3 EN ISO 12100 1 2 EN 55014 1 2 Company Place date Signature Designated position T V S D Industrie Service GmbH Nr 0036 EC Directives 2014 68 EU Designation...

Страница 40: ...ait deutschland GmbH Industriestra e 3 D 95359 Kasendorf Germany www ait deutschland eu alpha innotec an ait deutschland GmbH brand UK...

Отзывы: