Installation
40
Functional Test
Once the mounting, wiring, and other installation steps are completed, proceed to the
Radian Series
Inverter/Charger Operator’s Manual
. The
Operator’s Manual
has steps for system commissioning. These
include powering up and performing a functional test on the inverter system, as well as powering
down and adding new devices to an existing system.
Refer to the
MATE3 System Display and Controller Owner’s Manual
(or the appropriate system display
manual) for programming instructions and menus.
When commissioning a grid-interactive system for use in Australia:
To meet the standard AS4777.3, the acceptance settings shall not exceed the following. The factory
default settings meet these requirements.
Table 5 AS4777.3 Acceptance Settings
Minimum
Voltage
Maximum
Voltage
Minimum
Frequency
Maximum
Frequency
200 Vac
270 Vac
45 Hz
55 Hz
Preventative Maintenance
The Radian inverter requires almost no regular maintenance. However, OutBack recommends the
following items on a periodic basis:
Check all electrical connections periodically for tightness using the torque values from pages 19 through 22.
Check the fan screens on each module and clear them of any debris.