![Alpha ESS SMILE-T10-HV-INV Скачать руководство пользователя страница 30](http://html.mh-extra.com/html/alpha-ess/smile-t10-hv-inv/smile-t10-hv-inv_user-manual_2905564030.webp)
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 30 of 43
Your Smart Energy
6.2
Configuring the safety standard
Please set the safety standard appropriate for your country or purpose via APP or Web
during pilot run;
The safety standard must be set correctly
If you select a safety standard which is not valid for your country and purpose, it may
cause a disturbance in the energy storage system and lead to problems with the grid
operator. When selecting the safety standard, you must always observe the locally
applicable standards and directives as well as the properties of the PV system (e.g.
PV system size, grid-connection point).
•
If you are not sure which safety standard is valid for your country or purpose, con-
tact your grid operator for information on which safety standard is to be configured.