___________________________________________________________________
Alpha ESS Co., Ltd.
Page 28 of 43
Your Smart Energy
Note:
The system will not be able to connect to the Internet without WiFi configuration.
Step 5:
Set basic parameters, including PV capacity on the grid side, the type of me-
ters, safety regulations and regional application standard. Click “Submit” when the
settings are complete.
Note:
When the safety regulation is set as AS4777.2, the secondary sub-options can be se-
lected according to the region or local grid company (Please refer to Appendix 2).
Commissioning
6.1
Checking Before Power-On
Table 9-1 Installation checklist
No.
Check Item
Acceptance Criteria
1
Battery pack and in-
verter mounting
The battery pack and inverter are mounted cor-
rectly, securely, and reliably.
2
WiFi mounting
The WiFi module is mounted correctly, securely,
and reliably
3
Cable layout
Cables are routed properly as required by the
customer.
4
Cable tie
Cable ties are secured evenly and no burr exists.
5
Grounding
The ground cable is connected correctly, se-
curely, and reliably.
6
Switch and breakers
status
All breakers connecting to or on the product are
OFF.