
50
It will indicate the status of linking to each Provision Servers. The
gateway will link to one of the five setting Provision Server each time.
If successful link, it will display green indicator. If failure link, it will
display red indicator. The yellow indicator means it is disable.
c.
Last link time:
Display the Date & Time for last successful link to
Provision server on this gateway.
d.
Numbers of successful link
:
Display the times of successful linking
from
Provision Server
to this gateway
.
e.
Numbers of successful update
:
Display the times of successful
linking and update the parameters from t
Provision Server
to this
gateway
.
f.
Last link action
:
Display the latest action command for provision
function.
g.
Gateway
:
Display the Network router gateway IP address for used
on the Internet connection.
h.
Provision Server IP:
User can manual add a new Provision Server
by add its IP here and press Link .Please remember enable auto
provision function before you input the new Provision Server IP.
For store back to flash memory, please press Save Modification (
/
Syetem
Maintenance
/
Save Modification/
).