
Maintenance
Assembling the progressing cavity pump
36
Series AE1F, AE1L, AE.E, AE.N, AE.H, AE.V, AED1E,
AED2N
ID, ZD construction types
BA-2011.11
760.0002 GB - 150 500
3. Slide joint clamps (306), joint collars
(308), and joint sleeve (304) onto the
joint shaft (307).
4. Slide the joint shaft (307) into the head
of the rotor (401).
5. Slide the joint pin (301) into the joint
bush (302) and fully drive in bushes for
joint pin (303).
6. Where needed, grind the outer
diameter of the joint sleeve (304) and
pull onto the head of the rotor (401).
7. After pulling on the joint sleeve (304)
secure it against axial shifting on the
head of the rotor (401).
Caution!
To do this, drive the face side of the
joint sleeve (304) with a prick punch
into the groove on the head of the
rotor (401) (see image below)!
Fig. 18 Securing the joint sleeve
8. Use a screwdriver to pull up the joint
collar (308), lift up on top with
screwdriver, guide the oil bottle’s
thrower under the collar and fill the
joint area with ALLWEILER special
joint oil type B or oil ET 1510 ISO 460
from Tribol Lubricants GmbH of
Mönchengladbach, Germany. If used
in the food industry, fill with
ALLWEILER special joint oil type BL or
oil 1810/460 from Tribol Lubricants
GmbH of Mönchengladbach,
Germany. Filling volume see table
section 9.1.7 page 25.
9. Check if the joint clamp’s (306) bent
strap is contacting the joint clamp seal.
If it is not, apply pressure with a
commercially available pliers (see next
image).
Fig. 19 Apply pressure to the joint clamp strap on the
joint clamp seal.
10. Place the joint clamps (306) into the
grooves around the joint collar (308)
and tighten.
Notice!
Use the clamping tool below:
•
For pump sizes smaller/equal
to:
AE1F 703, AE1L 751, AE1N
200, AE2N 200, AE4N 200,
AED2N 300, AE1E 380, AE2E
380, AED1E 560, AE.H 100,
AE.V 50 use clamping tool
PoK-It II.
•
For pump sizes larger/equal
to:
AE1F 1003, AE1L 1001, AE1N
380, AE2N 380, AE4N 380,
AED2N 560, AE1E 750, AE2E
750, AED1E 1200, AE.H 200,
AE.V 100 use clamping tool
Band-It together with adapter
J050.
These tools can be obtained from us.
Tightening the joint clamps is described in the
next section.
10.2.4.1 Tightening with Band-It clamping
tool and adapter J050
1. Insert strip end of the joint clamp (306)
(up to the joint clamp seal) into the
clamping tool with adapter.
2. Securely hold the clamp end with the
clamping tool's lever and tighten the
joint collar (306) by turning the crank
(
see next image).
Содержание AE E Series
Страница 61: ...760 0002 GB 150 500 BA 2011 11 Series AE1F AE1L AE E AE N AE H AE V AED1E AED2N ID ZD construction types 55...
Страница 62: ...56 Series AE1F AE1L AE E AE N AE H AE V AED1E AED2N ID ZD construction types BA 2011 11 760 0002 GB 150 500...
Страница 63: ...760 0002 GB 150 500 BA 2011 11 Series AE1F AE1L AE E AE N AE H AE V AED1E AED2N ID ZD construction types 57...