Alltion (Guangxi) Instrument Co., Ltd.
18
Product Assembly
|
AM-2000 User’s Manual
Suspending of Ceiling Mount
The suspending installation of first arm is applicable to ceiling mount System and high-position
wall mount system.
Because the first arm has certain weight and is long, please install by two operators together for
safe installation.
Lift the cross arm bracket (1) to a position under the column, insert the decorative ring (2)
into the column, insert the power plug (3) on the column into the power connector (4),
Tighten with the nut (5) on the power plug.
Insert the connecting shaft on the first arm
support into the upright post, align at the
clamping groove and insert the limit block
(6); tighten four M6 × 16 hexagon socket
countersunk head screws (7) around four
sides.
After the limit block (6) is inserted in place, the
first arm support can be loosened;
Put the decorative ring (2), lock the side
edge with M3 × 6 hexagon socket
countersunk head screws (8), finish
installation.
5
2
3
4
1
Содержание AM-2000
Страница 9: ...Alltion Guangxi Instrument Co Ltd AM 2000 User s Manual Safety Caution 5 1 4 3 2 3 5...
Страница 11: ...Alltion Guangxi Instrument Co Ltd AM 2000 User s Manual Product Assembly 7 2 1 3 4 5 7 8 6...
Страница 14: ...Alltion Guangxi Instrument Co Ltd 10 Product Assembly AM 2000 User s Manual 17 19 20 18...
Страница 34: ...Alltion Guangxi Instrument Co Ltd 30 Product Functions AM 2000 User s Manual 1 2 3 4 5 6 7 7 7...
Страница 36: ...Alltion Guangxi Instrument Co Ltd 32 Product Functions AM 2000 User s Manual 5 7 3 1 2 4 6 7...