
Illustration 3e: Electrical Attachment - Optional
B x 16
Step 1
- Place worksurface topside down on a clean, dry surface. Place assembled base on top.
Step 2
- Align pilot holes on the underside of the worksurface. Use 16
B
screws to attach base to worksurface through
attachment plate. Stand unit upright and adjust levelers.
*** All pilot holes must have a fastener installed***
Step 1
- Determine locations for the slide mount on the underside of the worksurfaces. Reference images below for
suggested locations.
Step 2
- Install slide mount to the underside of the worksurface with given hardware and insert Minitap. Use provided
clips to hold Nodes to bottom of worksurface.
Step 3
- Use Cable Management Straps (
C)
to secure excess cord to frame.
Node
Node Clip
Slide Mount
Installation Packet
Park
3430408700
Page 8 of 9
Illustration 3d: Worksurface Attachment
Cable Management
Strap