All
SportSystems, Inc.
©
2018.
STEP 3 - Hang Projector
NOTE:
Before hanging projector, install the SkyRailPlus™ and complete the enclosure
assembly. See
MINIBAY™ and SUPERBAY™ INSTALLATION GUIDE
at
www.allsportsystems.net
for detailed instructions on how to install the SkyRailPlus™ on
your MiniBay™ or SuperBay™. Thereafter, hang your projector as outlined below.
Slide bracket on to CUBED bracket, and install set screws to lock-in projector. Note
that bracket allows rolling left/right and pitching up/down in order to level projector.
Side the projector forward/backward on the SkyRailPlus™ to position projector correct
distance from the screen for optimal sized image. Tighten wing nuts to secure position.
Need Help?
Having trouble positioning your projector? As noted under
Find SkyRailPlus™ Position
for your projector
the SkyRailPlus™ can be configured in a number of positions for
optimal projector placement. If you have questions or need assistance don’t hesitate to
contact us.
All Sport Systems, Inc.
Sales/Support 877-847-1280
Email:
Page 16 of 16
Rev August 10, 2018