17
6/9/2011
TRAILERING, TRANSPORTING AND LIFTING
PREPARING THE NIGHT LITE PRO V SERIES FOR DELIVERY OR
RENTAL
The
NIGHT LITE PRO V
SERIES
light tower requires service as well as proper operation in order to
provide the performance and safety it has been designed for. Never deliver or put machine into ser-
vice with known defects or missing instructions or decals. Always instruct the customer in proper
operation and safety procedures as described in this
Operator’s Manual.
Always provide the manual
with the equipment for proper and safe operation.
CHECK LIST
Visually inspect the equipment to ensure that all instructions and decals are in place and legible.
Inspect the light tower locking bar latch assembly which locks the light tower in the vertical posi-
tion for proper operation.
Check the hitch assembly and safety chains.
Check the outriggers and jacks to make sure they operate properly.
Inspect the light assemblies for damage and test for proper operation.
Inspect the electrical wiring for signs of damage.
Danger!
Electrocution Hazard.
Do not operate the light tower if the insulation on the electrical cord or other
electrical wiring is cut or worn, or if bare wires are exposed. Repair or re
place damaged wiring before starting the engine.
Check ground rod cable and the ground lug. Make sure they are clean, undamaged and func-
tional.
Inspect tires to insure good condition and proper inflation.
Check engine oil, fuel, engine coolant levels and hydraulic fluid levels, if equipped.
Check to make sure the
Light Tower Operator’s Manual and Generator Operator’s Manual
are
with the equipment.
Check to make sure the quick reference operation card is with the equipment and properly teth-
ered.
Inspect the machine physically for damage and repair if necessary.
NOTICE:
See appropriate section of the Engine Operator’s Manual and Generator Operator’s
Manual for additional pre-operation checks.
Содержание Night Lite Pro SE Power V Series
Страница 2: ......
Страница 8: ...8 6 9 2011 SAFETY...
Страница 9: ...9 6 9 2011 SAFETY...
Страница 10: ...10 6 9 2011 SAFETY...
Страница 11: ...11 6 9 2011 SAFETY...
Страница 12: ...12 6 9 2011 SAFETY...
Страница 14: ...14 6 9 2011 SAFETY PART NO 090160 PART NO 090005 PART NO 090159 PART NO 090159...
Страница 16: ...16 6 9 2011 NOTES...
Страница 24: ...24 6 9 2011 TRAILERING TRANSPORTING AND LIFTING...
Страница 25: ...25 6 9 2011 TRAILERING TRANSPORTING AND LIFTING...
Страница 26: ...26 6 9 2011 TRAILERING TRANSPORTING AND LIFTING...
Страница 27: ...27 6 9 2011 GENERAL SERVICE INFORMATION EQUIPMENT IDENTIFICATION...
Страница 34: ...34 6 9 2011 GENERAL SERVICE INFORMATION...
Страница 36: ...36 6 9 2011 OPERATION...
Страница 37: ...37 6 9 2011 OPERATION...
Страница 38: ...38 6 9 2011 OPERATION...
Страница 42: ...42 6 9 2011 OPERATION...
Страница 45: ...45 6 9 2011 OPERATION...
Страница 48: ...48 6 9 2011 MAINTENANCE...
Страница 49: ...49 6 9 2011 MAINTENANCE...
Страница 50: ...50 6 9 2011 MAINTENANCE...
Страница 51: ...51 6 9 2011 MAINTENANCE...
Страница 52: ...52 6 9 2011 MAINTENANCE...
Страница 53: ...53 6 9 2011 TROUBLESHOOTING...
Страница 54: ...54 6 9 2011 MAINTENANCE RECORD DATE SERVICE DESCRIPTION SERVICED BY...
Страница 55: ...55 6 9 2011 KOHLER ENGINE WIRING SCHEMATIC...
Страница 56: ...56 6 9 2011 KOHLER CONTROL PANEL WIRING SCHEMATIC...
Страница 57: ...57 6 9 2011 CAT C1 1 ENGINE WIRING SCHEMATIC...
Страница 58: ...58 6 9 2011 KUBOTA D1105 WIRING SCHEMATIC...
Страница 59: ...59 6 9 2011 MECC ALTE GENERATOR WIRING SCHEMATIC...
Страница 60: ...60 6 9 2011 MECC ALTE GENERATOR WIRING SCHEMATIC...
Страница 61: ...61 6 9 2011 MECC ALTE GENERATOR WIRING SCHEMATIC PRE 2011...
Страница 62: ...62 6 9 2011 MARATHON GENERATOR WIRING SCHEMATIC...
Страница 63: ...63 6 9 2011 HYDRAULIC SYSTEM WIRING SCHEMATIC...
Страница 64: ...64 6 9 2011 E STOP W O GLOW LAMPS...
Страница 65: ...65 6 13 2011 TAILLIGHT WIRING SCHEMATIC...
Страница 66: ...66 6 9 2011 WARRANTY...
Страница 67: ...67 6 9 2011 WARRANTY...