Filters are not supplied with the unit. Inspect once a month. 
Replace disposable or clean permanent type as necessary. 

Do not replace permanent type with disposable.

Motors

Indoor and outdoor fan and vent motors are permanently 
lubricated and require no maintenance.

Rollout Switch  

The switch is located on the left side of 

burner box.  In the event of a sustained main burner rollout, 
the rollout switch shuts off the ignition control and closes 
the main gas valve.  To reset, push the button on top of the 
switch.

Auxiliary Limit  

This control is located in the side of the 

circulation air blower housing.  The switch opens and shuts 
off the blower/ignition control and closes the main gas valve 
should the circulation blower fail to operate.  This control 
resets automatically.

High Altitude

The input rate shown on the rating plate is for elevations 
up to 2000 feet.  For elevations from 2001 to 4500 feet, the 
input rate is reduced by 5%. For elevations above 4501 feet,  
refer to the National Fuel Gas Code Z223.1 (latest edition) 
or the Canadian Installation Codes CAN/CGA-B149.1 & 
B149.2 for further details.

Secure Owner’s Approval

When the system is functioning properly, secure the owner’s 
approval.  Show the owner the location of all disconnect 
switches and the thermostat. Instruct the owner on how to 
start and stop the unit and how to adjust temperature settings 
within the limitations of th

e system.

MAINTENANCE

Periodic inspection and maintenance normally consists of 
changing or cleaning the 

fi

 lters and cleaning the outdoor coil.  

On occasion, other components of the furnace may also require 
cleaning.

2.  When the speed of the combustion air blower reaches 

proper RPM, the pressure switch closes, initiating a 
pre-purge period (30 seconds nominal).

3.  When the pre-purge period has expired, the  ignition 

control energizes the main gas valve and spark 
electrode for a period of 10 seconds.  

4. If 

the 

fl ame sensor does not sense that a fl ame has been 

established in the 10-second interval, then the ignition 
control will  de-energize the gas valve, and begins a 30 
second interpurge period, then initiates another trial for 
ignition.

5.  The ignition control is designed to repeat this “trial 

for ignition” a total of three times.  If, at the end of the 
third trial, fl ame still has not been established, then the 
ignition control will try to light again 1 hour later.  The 
1-hour retry is indefi nite.  The ignition control can be 
reset by interrupting the unit power or the thermostat 
circuit.

6.  When the thermostat is sa

Ɵ

 s

fi

 ed, the combus

Ɵ

  on air blower 

and gas valve are de-energized. The circulation air 
blower will continue to run for a short period after the 
furnace is shut down.

Blower OFF Delay – Heating

The circulating air blower  “OFF” delay is 120 seconds after 
shutting down the burners.  This delay is not adjustable.

Safety Controls

The control circuit includes the following safety controls:

Limit Control  

This control is located inside the heating 

compartment and is designed to open at abnormally high 
circulating air temperatures.  It resets automatically.  The 
limit control operates when a high temperature condition, 
caused by inadequate airfl ow, occurs.  This closes the main 
gas valve. 

Pressure Switch  

If the combustion air blower should fail, 

the pressure switch prevents the spark electrode and gas 
valve from being energized.

Flame Sensor   

If the ignition control does not receive a 

signal from the fl ame sensor indicating that the burners have 
established fl ame, the gas valve closes after the 10-second 
trial for ignition period. 

Shut off all electrical power to the unit before conducting 
any maintenance procedures.  Failure to do so could 
cause personal injury.

  WARNING

Содержание RGE Series

Страница 1: ...d home application the ductwork must be sized to achieve static pressures within the manufacturer s guidelines All other installation guidelines must also be followed Failure to do so may result in equipment damage personal injury and improper performance of the unit WARNING Never use a flame to check for gas leaks Explosion causing injury or death may occur WARNING Do not store combustible materi...

Страница 2: ...a forklift while still in the factory supplied packaging The lengths of the forks of the forklift must be a minimum of 42 Inspection As soon as the unit is received it should be inspected for possible damage during transit If damage is evident the extent of the damage should be noted on the carrier s freight bill A separate request for inspection by the carrier s agent should be made in writing Lo...

Страница 3: ...f a roof curb is used follow the manufacturer s Installation Instructions and be sure that all required clearances are observed see Clearances section on this page This unit is shipped with four 4 corner brackets in place on the underside of the unit see Figure 1 All four 4 brackets must be removed before unit is installed onto roof curb assembly To avoid interference with roof curb remove the out...

Страница 4: ...termined that each appliance remaining connected to the common venting system properly vents when tested as outlined above return doors windows exhaust fans fireplace dampers and any other fuel burning appliance to their previous condition of use 8 If improper venting is observed during any of the above tests the common venting system must be corrected See National Fuel Gas Code ANSI Z223 1 latest...

Страница 5: ... Air Conditioning Contractors of America ACCA A closed return duct system shall be used This shall not preclude use of economizers or outdoor fresh air intake It is recommended that supply and return duct connections at the unit be made with flexible joints The supply and return air duct systems should be designed for the CFM and static requirements of the job They should not be sized by matching ...

Страница 6: ...parate line and installed in accordance with all safety codes listed on page 1 After the gas connections have been completed open the main shutoff valve admitting normal gas pressure to the mains Check all joints for leaks with soapy solution or other material suitable for the purpose Never use a flame to check for gas leaks Explosion causing injury or death may occur WARNING The furnace must be i...

Страница 7: ...most regulator manufacturers and LPG propane gas suppliers Check all connections for leaks when piping is completed using a soapy solution Some soaps used for leak detection are corrosive to certain metals Carefully rinse piping thoroughly after completing leak detection Electrical Wiring See Figures 6 7 All wiring should be done in accordance with the National Electrical Code ANSI NFPANo 70 lates...

Страница 8: ... At no time should the standby gas pressure exceed 13 w c nor the operation pressure drop below 5 w c for natural gas units or 11 w c for propane gas If gas pressure is outside these limits contact the gas supplier for corrective action 4 Adjust temperature rise to be within the range specified on the raƟng plate To Light Main Burners 1 Turn off electrical power to unit 2 Turn the thermostat to lo...

Страница 9: ... d To Reassemble Reverse above steps Example The heating value of the gas is 1053 BTU cubic foot By actual measurement it takes 38 seconds for the hand on the 1 cubic foot dial to make a revolution with a 100 000 BTU HR furnace running The result is 99 750 BTU HR which is close to the 100 000 BTU HR rating of the furnace Manifold Gas Pressure Adjustment Regulator LPG Propane Gas LPG propane units ...

Страница 10: ...nnected open the main manual gas shutoff valve check for and correct any gas leaks Turn electrical power on initiate a call for heat and check for proper burner operation 8 Install burner access panel Heat Anticipator The heat anticipator setting is 0 75 amp It is important that the anticipator setpoint be correct Too high of a setting will result in longer heat cycles and a greater temperature sw...

Страница 11: ...pre purge period 30 seconds nominal 3 When the pre purge period has expired the ignition control energizes the main gas valve and spark electrode for a period of 10 seconds 4 If the flame sensor does not sense that a flame has been established in the 10 second interval then the ignition control will de energize the gas valve and begins a 30 second interpurge period then initiates another trial for...

Страница 12: ...box Carefully remove the flue collector box without ripping the adjacent insulation 4 Using a wire brush on a flexible wand brush out the inside of each heat exchanger from the burner inlet and flue outlet ends 5 Run the wire brush down the heat exchanger tubes from the burner end 6 Brush out the inside of the flue collector box 7 Clean the combustion air blower wheel and housing Run the wire brus...

Страница 13: ...506941 01 Page 13 of 16 Issue 1148 CONNECTION DIAGRAM SINGLE STAGE HEAT 230 V 3 PHASE Figure 10 ...

Страница 14: ...Page 14 of 16 506941 01 Issue 1148 CONNECTION DIAGRAM SINGLE STAGE HEAT 460 V 3 PHASE Figure 11 ...

Страница 15: ... All applications Ten 10 years LF24 and TUA Stainless All applications Fifteen 15 years LD24 Aluminized All applications Two 2 years LD24 Stainless All applications Five 5 years LG14 All applications Five 5 years Burners LG14 Three 3 years Compressors 4SCU13LC 4SHP13LC Five 5 years TSA TPA Five 5 years KCA KGA KHA TCA TGA THA Five 5 years RGE13 RHP13 RCE13 Five 5 years NOTE If the date of original...

Страница 16: ...omponents indoor unit outdoor unit and re frigerant control devices which do not match or meet the specifica tions recommended by the manufacturer e Operation of packaged gas electric units equipped with aluminized heat exchanger with mixed air temperatures of less than 45 F 7 C f Operation of furnaces with return air temperatures of less than 60 F 16 C or operation of a furnace field installed do...

Отзывы: