508219-01
Issue 2132
Page 43 of 43
Start-Up and Performance Checklist
Job Name _________________________________________ Job no. _____________________________ Date ________________
Job Location ____________________________________________ City ______________________ State ____________________
Installer ________________________________________________ City ______________________ State ____________________
Unit Model No. _____________________ Serial No. __________________________ Service Technician ____________________
Nameplate Voltage __________________________________________________________________________________________
Rated Load Ampacity ________________ Compressor _______________________ Outdoor Fan ________________________
Maximum Fuse or Circuit Breaker _______________________________________________________________________________
Electrical Connections Tight?
□
Indoor Filter Clean?
□
Supply Voltage (Unit Off) _______________
Indoor Blower RPM _________________ S.P. Drop Over Indoor (Dry) ____________ Outdoor Coil Entering Air Temp. __________
Discharge Pressure ________________ Vapor Pressure ____________________ Refrigerant Charge Checked?
□
Refrigerant Lines: Leak Checked?
□
Properly Insulated?
□
Outdoor Fan Checked?
□
Services Valve:
Fully Opened?
□
Caps Tight?
□
Thermostat
Voltage with Compressor Operating ________________________ Calibrated?
□
Properly Set?
□
Level?
□
Содержание 4SCU14LB
Страница 34: ...508219 01 Issue 2132 Page 34 of 43 Wiring Diagram Figure 13 A C Single Phase Wiring Diagram ...
Страница 35: ...508219 01 Issue 2132 Page 35 of 43 Figure 14 A C Single Phase Wiring Diagram 59 model only ...
Страница 36: ...508219 01 Issue 2132 Page 36 of 43 Figure 15 3 Phase 208 230 Volt ...
Страница 37: ...508219 01 Issue 2132 Page 37 of 43 Figure 16 3 Phase 460 Volt ...
Страница 41: ...508219 01 Issue 2132 Page 41 of 43 Charge Labels Figure 17 4SCU16LE 4SCU14LB 50 ...
Страница 42: ...508219 01 Issue 2132 Page 42 of 43 Figure 18 4SCU14LE LB 4 thru 7 ...