Chapter 2: Installation
38
Figure 16. Plugging in the AC Power Cord
2. Plug the other end of the power cord into a wall outlet.
3. Verify that the POWER LED is green. If the LED is OFF, refer to
Chapter 3, “Troubleshooting” on page 41.
The switch is now powered on and ready for network operations. To
start a local management session on the switch, refer to “Starting a
Local Management Session” on page 39. To start a remote
management session, the switch must have an IP address. For
information about giving the switch an IP address and starting a
remote management session, refer to the
AT-S80 Management
Software User’s Guide
.
Warning:
Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.
5
Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible.
7
871