AT-FS750/16 and AT-FS750/24 Fast Ethernet Smart Switches Installation Guide
29
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesyn.
2. Place the switch on a level, secure surface.
3. Ensure that the following hardware components are included in your
switch package. If any item is missing or damaged, contact your Allied
Telesyn sales representative for assistance.
One AT-FS750/16 or AT-FS750/24 Smart switch and the following:
Two rack-mount brackets
Eight rack-mount bracket screws (black)
Four rack-mounting screws (stainless steel)
Four rubber feet (for desktop use)
One management cable
One power cord
Documentation CD