Contents
8
Chapter 5: Installing the GS970EMX/28 Switch in an Equipment Rack ........................................................................71
Chapter 6: Installing the GS970EMX/10 Switch on a Wall ..............................................................................................75
Chapter 7: Installing GS970EMX/20 and GS970EMX/28 Switches on a Wall ................................................................85
Chapter 8: Verifying the Switch ........................................................................................................................................95
Chapter 9: Cabling Copper and SFP+ Ports ..................................................................................................................105
Chapter 10: Troubleshooting ..........................................................................................................................................113
Appendix A: Technical Specifications ...........................................................................................................................117
Содержание CentreCOM GS970EMX Series
Страница 6: ...6...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 56: ...Chapter 2 Beginning the Installation 56...
Страница 70: ...Chapter 4 Installing the GS970EMX 20 Switch in an Equipment Rack 70...
Страница 104: ...Chapter 8 Verifying the Switch 104...
Страница 116: ...Chapter 10 Troubleshooting 116...