5
Chapter 2
Installation
Before installing the CentreCOM AT-3675
SNMP-Manageable Learning
Bridge
, check to see that the package contents are complete. If any of the
following items are missing or damaged, contact your sales
representative.
❑
CentreCOM AT-3675 SNMP-Manageable Learning Bridge
❑
User Manual
❑
Warranty statement and registration cards
❑
Power cord (U.S.A. version only)
Save the shipping carton and packing material in case you need to ship or
store the bridge in the future.
Site Selection
Before installing the AT-3675 bridge, read the safety installation
requirements starting on page i.
The AT-3675 bridge should be placed in a cool, well-ventilated area. Air vents
are located on each side of the bridge. It is very important that none of the
vents is obstructed. Several inches of clearance should be allowed between
these vents and any other object, e.g., a wall or other equipment.
Failure to follow these ventilation guidelines may result in overheating and
eventual damage of the bridge.
Factory Configuration
The AT-3675 bridge is configured at the factory to use the AUI ports on both
channels. The AUI connectors (labeled 10BASE5) are active. If you use the
bridge in an IEEE 802.3 10BASE5 (or a pre-802.3 Ethernet) environment, no
additional configuration is required.
!
Attention
!
Caution