![Allied Telesis CentreCOM AT-3675 Bridge Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/allied-telesis/centrecom-at-3675-bridge/centrecom-at-3675-bridge_user-manual_2902377013.webp)
9
Chapter 3
Operation
This chapter describes the features of the CentreCOM AT-3675 SNMP-
Manageable Learning Bridge and shows the basic operating procedures. It
covers how the bridge can be used to overcome common physical limitations
and how to employ the bridge in such a way that network performance is
improved.
Power On
When the power is first applied, the green System Power and red Diagnostics
indicators are illuminated. The green network Activity indicators are OFF.
Diagnostics
The AT-3675 bridge executes a comprehensive set of diagnostics when the
power is first applied. The red diagnostic LED stays ON and the port’s
Receive and Transmit indicators flash as the tests are executed. The
Diagnostic indicator turns OFF after successful completion of the tests. If
any tests fail, the Diagnostic indicator remains ON. In the latter case, the
bridge should be returned for service. Refer to the inside back cover for the
ATI location near you.
Normal Operation
Under normal operation, the green Activity indicators reflect the reception
and transmission of data packets, as summarized in Table 5.
Table 5: Activity LEDs
Indicator
Meaning When ON
Transmit
Channel is Forwarding a Packet
Receive
Channel is Receiving a Packet