x930 Series Installation Guide for Virtual Chassis Stacking
135
6. Insert the four anchors into the holes.
7. Have two people hold the switch at the selected wall location while you
secure it with the four provided screws. Refer to Figure 65.
Figure 65. Installing the Switch on a Concrete Wall
8. Repeat this procedure for any other switches that are to be installed on
concrete walls.
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...