AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide
45
Figure 36. Switch Initialization Messages (Continued)
Assigning Active Workload to HA processes:
hsl, nsm, rmond, sflowd, vrrpd, irdpd, lacpd
lldpd, loopprotd, mstpd, authd, epsrd, imi, imiproxyd
Received event network.activated
Loading default configuration
Warning: flash:/default.cfg does not exist, loading factory defaults.
..
done!
Received event network.configured
awplus login:
Содержание AT-x210 Series
Страница 6: ...Contents iv ...
Страница 8: ...List of Figures vi ...
Страница 10: ...List of Tables viii ...
Страница 14: ...4 ...
Страница 30: ...Chapter 1 Overview 20 ...
Страница 56: ...Chapter 2 Installation 46 ...
Страница 60: ...Chapter 3 Troubleshooting 50 ...
Страница 61: ...AT x210 9GT AT x210 16GT and AT x210 24GT Switches Installation Guide 51 Appendix A Technical Specifications ...
Страница 66: ...Appendix A Technical Specifications 56 ...