Chapter 2: Installation
40
Refer to “Cabling and Powering on the Switch” on page 43 to complete
the installation.
Warning:
Reliable earthing of rack-mounted equipment should
be maintained. Particular attention should be given to supply
connections other than direct connections to the branch circuits
(e.g., use of power strips).
E37
Содержание AT GS900/8POE
Страница 1: ...613 000414 Rev D Layer 2 Gigabit Ethernet Switch AT GS900 8POE Installation Guide...
Страница 8: ...Figures 8...
Страница 10: ...Tables 10...
Страница 52: ...Appendix A Technical Specifications 52...