AT-SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
115
Figure 69. Attaching the Grounding Lug and Wire to the Grounding Post
6. Secure the grounding wire with the nut and washer removed in step 4,
with an 8 mm wrench. Refer to Figure 70 on page 116.
Allied Telesis recommends tightening the nut and washer to 26 inch-
lbs.