
Chapter 5: Installing the Gateway Indoors
84
Section II: Indoor Installation
Completing the Installation
To complete the installation, perform the following procedure:
1. Install an uninterruptible power supply according to the manufacturer’s
instructions.
2. Plug the power cable from the gateway into the UPS.
3. Turn on the UPS.
4. If necessary, plug the management cable into the console port, as
shown in Figure 56.
Figure 56. Connecting the Management Cable
Note
For networks with remote management enabled, no local
configuration is required.
5. Configure the AT-iMG646xx series intelligent multiservice gateway
according to your specifications and then unplug the management
cable.
6. Ensure that all provisioned services are functioning properly.
1193
Содержание AT-EN646
Страница 10: ...Tables 10 ...
Страница 16: ...Preface 16 ...
Страница 17: ...17 Chapter 1 Overview This chapter contains the follows sections Features on page 18 LEDs on page 21 ...
Страница 24: ...24 Section I Outdoor Installation ...
Страница 28: ...Chapter 2 Outdoor Installation Overview 28 Section II Indoor Installation ...
Страница 68: ...68 Section II Indoor Installation ...
Страница 86: ...86 Section III Troubleshooting ...
Страница 96: ...Appendix B Cleaning Fiber Optic Connectors 96 ...