
Chapter 4: Installing the Gateway Outdoors
54
Section I: Outdoor Installation
Required Tools and Supplies
The following tools and supplies are required to install the gateway:
Tools
Have the following tools on hand before you install the enclosure or
gateway:
Flat head and #2 Phillips screwdrivers
Wire cutters
Crimping tool
Additional
Supplies
You may also need the following supplies:
Silicone sealant
Electrical tape
Two UV-rated wire ties
Console cable (AT-RGCONSOLECABLE)
Power cable (AT-RG013-00)
Power supply (AT-iMG005G)
Fiber cleaning materials (see Appendix B, “Cleaning Fiber Optic
Connectors” on page 91)
You will need the following items to create a ground wire for the DC
terminal block:
One piece of #18 AWG stranded wire, 5-1/2-6 inches (140mm-
150mm) long, green with a yellow stripe
A 16-22 AWG #10 ring lug with a green insulation jacket
Содержание AT-EN646
Страница 10: ...Tables 10 ...
Страница 16: ...Preface 16 ...
Страница 17: ...17 Chapter 1 Overview This chapter contains the follows sections Features on page 18 LEDs on page 21 ...
Страница 24: ...24 Section I Outdoor Installation ...
Страница 28: ...Chapter 2 Outdoor Installation Overview 28 Section II Indoor Installation ...
Страница 68: ...68 Section II Indoor Installation ...
Страница 86: ...86 Section III Troubleshooting ...
Страница 96: ...Appendix B Cleaning Fiber Optic Connectors 96 ...