Chapter 2: Installation
50
4. Slide the transceiver into the slot until it clicks into place.
Figure 23. Installing an SFP Transceiver
5. Check to be sure that the handle on the SFP transceiver is in the
upright position, as shown in Figure 24, to prevent inadvertently
removing the transceiver.
Figure 24. Positioning the SFP Handle in the Upright Position
6. Repeat this procedure to install another SFP transceiver or go to
“Cabling the Switch” on page 53.
For SFP optical and cabling specifications, consult the documentation
shipped with the module.
SFP Handle
Содержание AT-9408LC/SP Series
Страница 36: ...Chapter 1 Overview 36...
Страница 68: ...Chapter 3 Troubleshooting 68...
Страница 76: ...Appendix A Technical Specifications 76...
Страница 98: ...Appendix B Translated Safety Statements 98 1 1 2 3 LAN 4 5 6 I 7 8 9 40 C 10 11 15 LAN OFF 12...
Страница 99: ...AT 9400 Series Layer 2 Gigabit Ethernet Switches Installation Guide 99 13 14 15 16 17 18 19 20 21 22 23 24 25...
Страница 101: ...AT 9400 Series Layer 2 Gigabit Ethernet Switches Installation Guide 101 41 42 TEL PSTN 43 26 AWG...
Страница 102: ...Appendix B Translated Safety Statements 102...