Allied Air 506299-01 Скачать руководство пользователя страница 7

506299-01

Page 7

Issue 0912

REPAIR PARTS

Blower wheel
Capacitor
Blower cutoff

Transformer
Rollout switch

Inducer blower and motor

The following repair parts are available from your local
distributor.  When ordering parts, include the complete
unit model number and serial number which are printed
on the rating plate located on the unit.

Gas Control Group

Manifold
Spark electrode
Burner
Flame sensor

Heat Exchanger Group

Heat exchanger
Flue cover

Blower Group

Blower assembly
Blower housing
Blower motor

Inducer Group

Pressure switch

Electrical Group

Limit switch
Fan control board
Ignition control

Cooling Group

Compressor
Fan motor
Fan blade

Orifice
Ignition wire
Gas valve

Coil
Drain pan
Contactor

Burner box

Owner Record

Model # _________________________________

Serial # _________________________________

Installation Date ___________________________

Installed by:

Dealer __________________________________

Address _________________________________

Telephone # ______________________________

License # ________________________________

Содержание 506299-01

Страница 1: ...E OF CONTENTS IMPORTANT SAFETY INFORMATION 2 OPERATING YOUR UNIT 3 MAINTENANCE OF YOUR UNIT 5 REPAIR PARTS 7 WARRANTY 8 Do not store or use gasoline or other flammable vapors and liquids in the vicini...

Страница 2: ...nspect the unit and to replace all gas controls control system parts electrical parts that have been wet or the unit if deemed necessary 6 Examine the unit installation to determine that A All flue ga...

Страница 3: ...ired point When the room thermostat is satisfied the electrical circuit to the gas valve is opened and the burners are shut off Shutting Down the Unit To shut down the unit set the thermostat to the O...

Страница 4: ...ture you would like the system to maintain Fan Operation You may wish to increase your comfort by setting your system for continuous air circulation of the indoor air The fan switch on the thermostat...

Страница 5: ...t the unit The vent motor should start and purge the system for 30 seconds After the prepurge time the burners should ignite If the burner does not ignite contact a qualified service technician for as...

Страница 6: ...he circulating air blower motor and the combustion blower motor is not recommended Blower Assembly Even with good filters properly in place blower wheels and motors will become dust laden after long m...

Страница 7: ...roup Heat exchanger Flue cover Blower Group Blower assembly Blower housing Blower motor Inducer Group Pressure switch Electrical Group Limit switch Fan control board Ignition control Cooling Group Com...

Страница 8: ...b proof of required periodic maintenance installation date and location and c an accurate description of the problem WARRANTY LIMITATIONS 1 This Limited Warranty is void if the covered equipment is r...

Страница 9: ...cycled waste water fertilizers or other damaging substances or other conditions beyond the control of Allied Air 2 Use of parts accessories or refrigerant not compatible with the unit 3 Modification c...

Страница 10: ...Page 10 506299 01 Issue 0912 NOTES...

Отзывы: