505872
61
Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
57. CYLINDER ROLLER
a. Remove two screws from bottom edge of front
panel. Refer to Figure 13.
b. Swing bottom of panel away from dryer to
disengage hold-down clips and guide lugs from
cabinet top. Refer to Figure 13.
c. Disconnect wires from door switch. Refer to
NOTE: Refer to appropriate wiring diagram when
rewiring switch.
d. Disengage belt from motor and idler pulleys.
e. Remove four screws holding bulkhead to front
flange of cabinet. Then lift complete bulkhead
assembly out of slots in cabinet. Refer to
Figure 32.
IMPORTANT: During reinstallation of front
bulkhead, be sure that air duct is properly
positioned with the flange inside the felt seal on
exhaust fan cover.
f. Pull cylinder forward allowing rear of cylinder
to drop down exposing rollers. Refer to
Figure 35.
g. Refer to Figure 36 for removal of roller from
bulkhead.
58. OUTLET COVER
Open door and remove two screws holding outlet
cover to rear bulkhead. Refer to Figure 35.
59. REAR BULKHEAD AND HEATER BOX
ASSEMBLIES
a. Remove two screws from bottom edge of front
panel. Refer to Figure 13.
b. Swing bottom of panel away from dryer to
disengage hold-down clips and guide lugs from
cabinet top. Refer to Figure 13.
c. Disconnect wires from door switch. Refer to
NOTE: Refer to appropriate wiring diagram when
rewiring switch.
d. Disengage belt from motor and idler pulleys.
NOTE: When reinstalling belt, be sure belt is
properly installed on motor and idler pulleys and is
on the correct side of the idler pulleys. Refer to
Figure 28. Belt must be positioned around cylinder
between center and rear baffle screws with the
ribbed surface against the cylinder. After installing
belt, rotate cylinder manually to check that belt is
properly aligned.
e. Remove four screws holding bulkhead to front
flange of cabinet. Then lift complete bulkhead
assembly out of slots in cabinet. Refer to
Figure 32.
IMPORTANT: During reinstallation of front
bulkhead, be sure that air duct is properly
positioned with the flange inside of the felt seal on
the exhaust fan cover.
f. Loosen two cabinet top hold-down screws.
Figure 36
DR050-SV-1
NUT
WASHER
ROLLER
REAR
BULKHEAD