![Allen Engineering Corporation 032034 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/allen-engineering-corporation/032034/032034_manual_2899369015.webp)
1A
OPERATIONS
1A-14
1.16 Drive Belts
To Tighten Belts
1. Loosen the jam nuts (E) located on the
adjustment bolts (B).
2. Tighten the engine plate adjustment bolts (B)
an equal number of turns until correct belt
tension is obtained. Maximum belt play
should be from 1/2 to 3/4" (13 to 19mm) at
the center of the span. New belts should be
re-tensioned after the first 10-12 hours of
operation.
3. Tighten all lock nuts and jam nuts.
To Replace
1. Loosen the four bolts(A) underneath the engine mounting plate. (refer to fig. 1)
2. Loosen Jam nuts(E) and Loosen engine plate adjustment bolts (B) until belt tension is relived. (refer
to fig 1.)
3. Loosen set screws(C) where the u-joint couples to the drive shaft. (refer to fig. 2)
4. Slide u-joint(D) off the drive shaft to create a gap in the drive line to allow removal of belts through
gap. (refer to fig. 2)
5. Install new belts through gap and reverse process to tighten new belts.
Be sure to reset the gap
between the U-Joints to between 3/64 to 3/16
(F)
.
(refer to fig. 2)
6. Tighten all nuts and jam nuts.
KAWASAKI ENGINE
REFERENCE ONLY
C
C
F
D
Fig. 1
*
*
Check tension frequently during the first
24-48 hours of operation.
*
*
Over tensioning shortens belt and bear-
ing life.
*
*
Keep belts free from foreign material
which may cause slip.
*
*
Make V-drive inspection on a periodic
basis. Tension when slipping.
Fig. 3
Fig. 2
Содержание 032034
Страница 23: ...2A PARTS ENGINE MOUNT SYSTEM 2A 4 VANGUARD LINAMAR...
Страница 27: ...2A PARTS SUPER DUTY SD GEARBOX RIGHT HAND SITTING ON MACHINE SOM PART 029141 2A 8...
Страница 29: ...2A PARTS 2A 10 SUPER DUTY SD GEARBOX LEFT HAND SITTING ON MACHINE SOM PART 029142...
Страница 31: ...2A PARTS FUEL SYSTEM ASSEMBLY 2A 12...
Страница 33: ...2A PARTS 2A 14 ELECTRICAL COMPONENTS...
Страница 35: ...2A PARTS 2A 16 VANGUARD WIRING DIAGRAM...
Страница 37: ...2A PARTS 2A 18 PITCH CONTROL ASSEMBLY...
Страница 39: ...2A PARTS STEERING LEVER ASSEMBLY 2A 20...
Страница 41: ...2A PARTS SPRAY SYSTEM ASSEMBLY 2A 22...
Страница 43: ...2A 24 2A PARTS SPIDER ASSEMBLY...