3XEOLFDWLRQ)HEUXDU\
Appendix
D
Program Synchronization
Chapter Objectives
7KLVDSSHQGL[SURYLGHV\RXZLWKUHIHUHQFHLQIRUPDWLRQRQWKH
SURJUDPV\QFKURQL]DWLRQIHDWXUH
Program Synchronization
Both processors in a ControlNet PLC-5 backup system execute their
own program logic. You can configure the ControlNet PLC-5 backup
system to have either Asynchronous program scans or Synchronous
program scans. Asynchronous mode allows the program scans on the
two processors to run as if they were stand-alone processors. When a
program scan on a processor is finished, housekeeping is performed,
and the next program scan is immediately started. The program scan
on one processor is completely independent of the program scan on
the other processor.
Synchronous mode provides both program scan synchronization as
well as housekeeping synchronization. When a program scan on a
processor is finished, housekeeping is delayed until a synchronization
point is reached. This synchronization point is the same for both
processors. Housekeeping is then performed at the same time on both
processors. By having housekeeping performed at the same time,
both processors should be updating the Input Image Table with the
same input values. When housekeeping is finished, the program
scans then immediately start and the cycle repeats itself.
Synchronous mode allows the inputs used by the two backup
processors to closely match each other, as well as forcing each
program scan to begin at the same time.
Synchronous mode offers only one synchronization point per
program scan. After the synchronization point is passed, the two
control programs run asynchronously until the next synchronization
point during the next housekeeping.
When the ControlNet backup system is configured in Asynchronous
mode, the Sync LED is off. When the ControlNet backup system is
configured in Synchronous mode, the Sync LED is either solid green
or solid red.
Содержание ControlNet PLC-5
Страница 1: ...User Manual ControlNet PLC 5 Hot Backup System Includes Cat No 1785 CHBM Allen Bradley...
Страница 30: ...Publication 1785 6 5 24 February 1999 3 18 Installing and Configuring Your ControlNet PLC 5 Backup System...
Страница 40: ...3XEOLFDWLRQ HEUXDU 4 10 Monitoring and Troubleshooting Your ControlNet PLC 5 Backup System...
Страница 42: ...3XEOLFDWLRQ HEUXDU A 2 Specifications...
Страница 58: ...3XEOLFDWLRQ HEUXDU B 16 Backup States...
Страница 70: ...3XEOLFDWLRQ HEUXDU D 4 Program Synchronization...
Страница 77: ...Publication 1785 6 5 24 February 1999...