Rockwell Automation Publication 1756-RM093J-EN-P - April 2018
57
Safety Application Development
Chapter 6
moved to another application, you must also perform start-up and functional
verification testing on the controller in the context of its new application.
for more information.
Confirm the Project
You must print or view the project, and compare the uploaded safety I/O and
controller configurations, safety data, and safety task program logic to make sure
that the correct safety components were downloaded, tested, and retained in the
safety application program.
If your application program contains a safety Add-On Instruction that has been
sealed with an instruction signature, you must also compare the instruction
signature, date/time, and safety instruction signature to the values you recorded
when you sealed the Add-On Instruction.
Appendix B, Safety Add-On Instructions
for information on creating and
using safety Add-On Instructions in SIL 3 applications.
The steps below illustrate one method for confirming the project.
1.
With the controller in Program mode, save the project.
2.
Answer Yes to the Upload Tag Values prompt.
3.
With RSLogix 5000 software offline, save the project with a new name,
such as Offlineprojectname.ACD, where projectname is the name of your
project.
This is the new tested master project file.
4.
Close the project.
5.
Move the original project archive file out of its current directory.
You can delete this file or store it in an archival location. This step is
required because if RSLogix 5000 software finds the projectname.ACD in
this directory, it will correlate it with the controller project and will not
perform an actual upload.
6.
With the controller still in Program mode, upload the project from the
controller.
7.
Save the uploaded project as Onlineprojectname.ACD, where
projectname is the name of your project.
8.
Answer Yes to the Upload Tag Values prompt.
Содержание 1756-L61S ControlLogix 5561S
Страница 10: ...10 Rockwell Automation Publication 1756 RM093J EN P April 2018 Preface Notes...
Страница 64: ...64 Rockwell Automation Publication 1756 RM093J EN P April 2018 Chapter 6 Safety Application Development Notes...
Страница 70: ...70 Rockwell Automation Publication 1756 RM093J EN P April 2018 Chapter 7 Monitor Status and Handle Faults Notes...
Страница 114: ...114 Rockwell Automation Publication 1756 RM093J EN P April 2018 Index Notes...
Страница 115: ......