![All Things Garage Tote Slide Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/all-things-garage/tote-slide/tote-slide_installation-manual_2897854009.webp)
4.
Measure and mark where each of the end lag screws will be placed before pre-drilling
both holes with a 1/8 inch drill bit. Have someone assist you by holding the opposite
end of the support rail as you drive in the first lag screw. Drive the second lag screw in at
the other end of your support rail, then pre-drill and drive in the two in the middle.
Be
sure to place all the lag screws directly in the center of your support truss!
Failure to
secure all lag screws directly into the center of your support truss may result in damage
and/or injury.
5.
Now install your second support rail parallel to the first.
Measure about 44 to 52 inches of space from your first rail, depending on the spacing of your
overhead support trusses.
Again, be sure to place all the lag screws directly in the center of
your support truss!
Again start by pre-drilling for the two end lag screws. Mount the support
rail and drive in the lag screws at each end. Then pre-drill and drive in the two middle screws,
just like you did for the first support rail.