![All Things Garage Tote Slide Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/all-things-garage/tote-slide/tote-slide_installation-manual_2897854011.webp)
8.
Once the bolts are attached, mount the first slide rail to the support rails by twisting the
strut “T” nuts 90 degrees and pushing them up into the support rails. Now turn them
clockwise 90 degrees and let the strut “T” nut rest in the support rail.
9.
Before tightening the bolt, measure from the wall or from the end of the support rail
and move the slide rail so that both ends are perpendicular to the support rails. Tighten
the bolts to secure the slide rail in place. Be cautious that you don’t bend or distort the
slide rail when tightening.
10.
Before mounting your second slide rail, determine how far apart the slide rails should be
by measuring your tote at the position shown, just below the lip.