W 3 1 S E R I E S
H I G H P R E S S U R E B R E A T H I N G A I R C O M P R E S S O R
©ALKIN Kompresör Sanayi ve Ticaret Limited Şirketi
41
Remove all hoses and pipes connected to priority valve.
Remove priority valve with appropriate tool. Clean its place.
Wrap teflon tape on the new priority valve and put it on its place and tighten with appropriate
tool.
Reconnect all hoses and pipes connected to priority valve.
Start the compressor. New priority valve should allow air flow at 150 bar.
2.5.12 V-Belt Replacement
Instruction no
12
Instruction name
V-belt Replace
List of tools required
appropriate tools
No of persons required
1 person
Estimated Completion Time
10 minutes
Parts list to be used in replacement
None
Stop the compressor and verify complete depressurization.
Remove flywheel grid with appropriate tools.
Remove belts from flywheel and install new ones. Rotate flywheel by hand to check tension.
Reconnect flywheel grid with appropriate tools. Start the compressor and check the proper rotation.
2.5.13 Purifier Cartridge Refill Kit Replacement
Instruction no
13
Instruction name
Purifier Cartridge Refill Kit Replace
List of tools required
Appropriate tools
No of persons required
1 person
Estimated Completion Time
20 minutes
Parts list to be used in replacement
P21 Purifier Refill Kit
Stop the compressor and verify complete depressurization of purifier with manual
drain.
Verify purifier gauges is 0.
Rotate the screws counter clockwise to remove purifier head. (When removing
the head, purifier cartridge will come along.)
Remove the cartridge from the head.
Refill the cartridge according to the instruction in the refill kit.
Oil the O-rings with appropriate oil and install them onto purifier head.
Purifier top head O-rings and threads, and purifier ass’y threads are cleaned and oiled, assembled. After
tightening for 20 mm, you may need a wrench to tighten properly.