W 3 1 S E R I E S
H I G H P R E S S U R E B R E A T H I N G A I R C O M P R E S S O R
©ALKIN Kompresör Sanayi ve Ticaret Limited Şirketi
27
1.8.2 Location
Important
IMPORTANT – READ CAREFULLY AND FOLLOW THE INSTRUCTIONS BELOW.
Location where the compressor is installed determines to a considerable extent the overall performance and service
life of the unit.
Compressor should be located in an area that is dry and sheltered, well ventilated, not
exposed to high ambient temperatures, air borne contaminants such as dust, fumes, lint, vapor, steam,
gases, engine exhaust and other contaminant.
Install the compressor at least 0.6 meter distance to surrounding
walls, to insure adequate cooling
and access
for service.
1.8.3 Piping
If piping is required between the compressor and the filling panel or fill station, depending on the length
between the compressor and the filling panel properly selected stainless steel pipes must be used. The piping
should be installed in full compliance with all Federal, State and local codes, standards and regulations. If
required, consult the manufacturer for further information.
1.9.4 Electrical Controls
Important
Although all electrical instructions addressed to the reader directly, the actual
inspection, wiring, installation, maintenance, repair, etc. must be carried out by licensed
and certified electricians only.
Make electrical connections to the compressor in accordance with the wiring diagrams and in full compliance
with all applicable federal, state and local standards, codes and regulations, including those dealing with the
earthing requirements. A few electrical checks should be made to insure that the first start-up will be trouble
free. Make the following checks before attempting any start up: