![Algas SDI Direct Fired F6-ASME Скачать руководство пользователя страница 48](http://html1.mh-extra.com/html/algas-sdi/direct-fired-f6-asme/direct-fired-f6-asme_operation-and-maintenance-manual_2896046048.webp)
Appendix A
5. Align valve stem with pivot screw and repeat the same step with the pin gasket and pivot screw on the opposite
side of the liquid inlet valve.
6. Verify there is no damage to the pin gasket. Set inlet valve assembly aside for an hour to allow locktite to
properly dry before reinstalling valve assembly back on the vaporizer.
7. Re-install valve in vaporizer with new flange gasket and uniformly torque bolts to 30-35 ft-lbs.
8. Re-connect sensing line to capacity control valve.
9. After assembly pressurize with 125-150 psig compressed air and apply soap solution or leak detection fluid to
both pin gasket areas and to the valve flange area to make sure there are no leaks.
Содержание Direct Fired F6-ASME
Страница 4: ...This page left intentionally blank...
Страница 7: ......
Страница 10: ...This page left intentionally blank...
Страница 35: ...Maintenance Algas SDI Operation and Maintenance Manual P N 54000 24 This page intentionally left blank...
Страница 41: ...Troubleshooting Algas SDI Operation and Maintenance Manual P N 54000 30 This page intentionally left blank...
Страница 42: ...APPENDIX A TECHNICAL INFORMATION...
Страница 43: ...Appendix A This page intentionally left blank...
Страница 50: ...Appendix A...
Страница 51: ...Appendix A...