alfen 904461001 Скачать руководство пользователя страница 20

20

Eve model 2017 (2.0) manual | Version 1.0 | July 2017 

ENGLISH

5 CONNECTIVITY

It might also be required to fill in a MAC address. You can 
find this address on the inspection certificate of the 
charging station. Please contact Alfen to receive a copy of 
this certificate.

REMARK

Make sure that your network configurations enable secured 
FTP connections to the Alfen servers. This makes it possi-
ble to exchange software updates and run diagnostics.

5.3 Registering your ICU EZ account

If you wish to subscribe to the ICU EZ back-end services, 
then register at: 

http://alfen.com/en/registration-form-connect

.

 

REMARK

You can register for ICU EZ once you received your charging 
station. During the registration process, the information of 
your first charging station is required. We use this  
information to identify you. Once your account is created, 
Alfen will send you your login information.
 
Did you forget to register while ordering ICU EZ? No 
problem: If you chose to have your charging station pre-
configured for ICU EZ, it is already registered and active in 
the administration system. All transactions and other past 
events are stored and are available for your inspection.

1.

  Complete the registration form on the Alfen website.

2.

  Please fill in the numbers on the back of the charge  

 

cards delivered to you in the ‘Remarks’ field.

3.

  Click on ‘Send’. 

4.

  Alfen will process your application and activate your  

 

account. You will receive your login information at the  

 

earliest opportunity.

5.

  Use your login information to login at 

 

http://alfen.com/en/login

.

6.

  Once you are logged into ICU EZ, you can directly  

 

monitor your charging station and its status.

5.4 Registering the charging station within your  
 

own administration system 

If you use your own administration system, or if this service 
is delivered by a third party, ensure that the charging 
station type is registered correctly. If these settings are 
not properly configured in this administration system, the 
charging station will not be able to connect.

Every Eve model has its own so called ChargePoint Model 
that is automatically sent along during the registration 
process pursuant to OCPP specifications. This consists of 

a platform identification, combined with a unique product 
identification:

• 

904461011

• 

 With Alfen NG920 platform: NG920-61011

The table below provides an overview of the various 
article number and OCPP code combinations. Once correct 
registration with the back-end system is completed, the 
charging station is able to connect easily.

Art. no.

OCPP chargePointModel

904461011

NG920-61011

904461012

NG920-61012

904461001

NG920-61001

904461002

NG920-61002

Содержание 904461001

Страница 1: ...Eve TM Model 2017 2 0 Manual Handboek Handbuch Manuel...

Страница 2: ...2 OUTSIDE BUITENZIJDE AUSSENSEITE EXT RIEUR 1 3 5 6 7 5 2 4 6 5 8...

Страница 3: ...3 INSIDE BINNENZIJDE INNENSEITE INT RIEUR 9 13 10 9 11 12 14...

Страница 4: ...4...

Страница 5: ...lly utilise all advanced features of your new system we advise you to read this manual carefully Properly store this manual for future usage We have invested a great amount of care to provide you with...

Страница 6: ...rging station 18 4 1 Safety instructions prior to usage 18 4 2 Commissioning 18 5 Connectivity 19 5 1 Administration systems 19 5 2 Establishing a connection 19 5 2 1 Wireless connection 19 5 2 2 UTP...

Страница 7: ...eral safety DANGER The safety instructions are intended to ensure proper practical usage If you do not comply with these safety regulations and instructions you may expose yourself to the risk of elec...

Страница 8: ...lour display to visualise the status of the charging station and inform the user about the charging progress 23 10 2017 12 30 Please hold card over reader below To stop charging please hold card over...

Страница 9: ...1 0 July 2017 ENGLISH 2 PRODUCT 2 3 Operating the charging station Plug Charge No charge card authorisation required RFID Charging station with user authorisation Start Stop Start 1 1 1 1 2 2 2 2 3 3...

Страница 10: ...site short circuit protection For 2x3 7kW 11kW 40A B residual current fuse or 35A gG fuses Load balancing optional For 2x7 4kW 22kW 40A B residual current fuse or 35A gG fuses Load balancing required...

Страница 11: ...7 4kW charging 32A selected per phase 904461011 3 x 6mm2 904461012 3 x 6 mm2 per cable 3 phase 22kW charging 32A selected per phase 904461001 5 x 6 mm2 904461002 5 x 6 mm2 per cable Nominal current 23...

Страница 12: ...ay have an adverse effect on the temperature range The temperatures mentioned above apply for the ambient temperature of the product assuming the standard colour of the casing RAL9016 Other darker col...

Страница 13: ...e RFID Maximum available charging current per socket 16A 32A Smart charging options Off Standard load balancing Active load balancing P1 Own logo shown on colour display Off Alfen logo On Your own log...

Страница 14: ...omponents that may still contain electrical charge after being disconnec ted Wait at least 10 seconds after disconnection before commencing work DANGER The electric system must be entirely disconnecte...

Страница 15: ...side of the charging station is covered to prevent it from being unintentionally disconnected or used by unauthorised individuals 3 3 Mechanical installation Use the following tools and equipment to i...

Страница 16: ...instance in the packaging of the Eve Be particularly careful with the display screen Image 3 Location of Torx T25 bolts to release adjust and fasten the enclosure Installing the charging station 1 Pl...

Страница 17: ...ide the charging station are enabled 9 Put the isolating switch on the I ON position If useful use a special wrench to simplify switching 10 Press the white part of the casing in the orifices on the t...

Страница 18: ...llowing actions are performed 1 The display briefly illuminates and then switches off 2 The sockets are tested individually testing locking testing internal relays switching is audible 3 The display b...

Страница 19: ...allation is complete always verify the signal strength using the Service Installer REMARK A connection with an administration system can only be established if you made arrangements with the supplier...

Страница 20: ...he Alfen website 2 Please fill in the numbers on the back of the charge cards delivered to you in the Remarks field 3 Click on Send 4 Alfen will process your application and activate your account You...

Страница 21: ...ug You can now start a new session 007 Charging error vehicle will not shut down Contact the service department the vehicle might not be responding correctly 101 Residual current device deactivated Co...

Страница 22: ...ommunicate with each other over the P1 port using the DSMR protocol version 4 0 or higher Data about the actual consumption and charging needs is regularly exchanged Whenever smart meter capacity is l...

Страница 23: ......

Страница 24: ...kt Contact Alfen ICU B V Hefbrugweg 28 1332 AP Almere The Netherlands P O box 1042 1300 BA Almere The Netherlands Tel Sales Support 31 0 36 54 93 402 Tel Service 31 0 36 54 93 401 Website ww alfen com...

Отзывы: