background image

 

                        Figure 7   Grate shaking                           Figure 8 Opening of the fixed (vertical) grate 

1.

 

Fixed (vertical) grate 

2.

 

Grate 

3.

 

Auxiliary handling tool 

4.

 

Ash pan 

 

Unpack the furnace and check for all the parts and equipment, especially pay attention to the following: 

-

 

Asbestos-free cord for sealing the hob (Fig. 2, pos. 12) should be spaced equally around the circumference 
of the furnace and it should fit perfectly in its channel; 

-

 

Furnace hob (Fig. 1, pos. 2) should be placed over the asbestos-free cord in order to ensure proper sealing; 

-

 

Filing door and kindling door (Fig. 1, pos. 3 and pos. 9) should be equipped with asbestos-free cord  that 
ensures complete sealing when the door is closed;  

-

 

Fixed (vertical) grate (Fig. 8, pos. 1) should be in its bearing and it should be easy to open; 

-

 

Using control switch on airflow regulator (Fig. 1, pos. 4) should enable easy opening/closing of fly nut on 
combustion air intake opening; 

-

 

If  it  is  correctly  installed,  airflow  regulator  enables  adjusting  and  automatic  maintaining  of  set  water 
temperature inside furnace; 

-

 

Remote  control  thermostat  used  for  measuring  the  temperature  in  the  boiler  (Fig.  1,  pos.  6)  is  properly 
installed only if the airflow regulator temperature probe is located in special opening in the front; 

-

 

Grate (Fig. 1, pos. 2) should be placed inside the fire box and it should be connected to grate shaker handle 
(Fig. 1, pos. 8) via shaker’s central cog which fits into conical opening on the bottom side of the grate; 

-

 

Chimney pot is factory mounted on the back side, but it could be installed laterally, on the left or on the 
right,  depending  on  the  position  of  the  furnace  compared  to  the  chimney,  as  well  as  regard  to  the 
available space;  

-

 

During lateral installation, lateral opening lid should be taken off prior to mounting the chimney pot and 
than the lateral opening lid should be used to close the back opening; 

-

 

When mounting, make sure that asbestos-free cord seals completely;  

-

 

Sheet metal for smoke emission direction (Fig. 2, pos. 11) should be placed in accordance to the chimney 
pot. If the chimney pot is in the back, than the sheet metal is mounted symmetrically to the furnace (in the 
middle), and if it is mounted laterally, than the sheet metal is placed strictly to the lateral side next to the 
chimney pot. 

Содержание CENTRAL 23

Страница 1: ...SOLID FUEL BURNING FURNACE FOR CENTRAL WARM WATER HEATING SYSTEM TYPE CENTRAL 23 INSTRUCTIONS FOR USE...

Страница 2: ...al 125 195 211 352m3 MAXIMAL OPERATING PRESSURE 1 9 bar MAXIMAL OPERATING TEMPERATURE 90 C WEIGHT gross net 140 153 kg FLUE GAS TEMPERATURE wood coal 335 345 C CONTENT OF CO 13 O2 0 45 0 36 ENERGY EFF...

Страница 3: ...Basic parts of the furnace 1 Furnace lid 2 Hob 3 Filling door 4 Draught regulator thermostat 5 Lateral side 6 Remote control thermostat 7 Outer door 8 Grate shaker handle 9 Door for kindling and ash...

Страница 4: ...Top view with an open hob position 2...

Страница 5: ...ing and cleaning kit 1 Auxiliary handling tool 2 Cleaning spatula 3 Fire hook AUXILIARY HANDLING TOOL AND POSSIBILITIES FOR ITS USE Figure 4 Figure 5 Furnace lid lifting Hob lid lifting Figure 6 Openi...

Страница 6: ...nace Remote control thermostat used for measuring the temperature in the boiler Fig 1 pos 6 is properly installed only if the airflow regulator temperature probe is located in special opening in the f...

Страница 7: ...e chimney pot and of the chimney pot axis height This furnace is designed for installation in the kitchen area as well as in any other available household space At the same time make sure that the sur...

Страница 8: ...er 2 Chimney pot 3 Distribution duct 4 Open expansion tank 5 Puff pipe 6 Radiator valve 7 Radiator 8 Vent valve 9 Circulating pump 10 Return duct 11 Open and shut off valve 12 Regulating valve 13 Ther...

Страница 9: ...ibution duct 4 Expansion tank 5 Safety valve 6 Radiator valve 7 Radiator 8 Puff pipe 9 Circulating pump 10 Return duct 11 Open and shut off valve 12 Regulating valve 13 Thermoregulation valve 14 Conne...

Страница 10: ...fuel up to the lower ledge of the filling door Fig 1 pos 3 If the fuel emits several gases the use of the bottom of the fuel layer is recommended as well as frequent refilling When the fuel emits larg...

Страница 11: ...emperature probe Approximate values for setting the airflow regulator thermostat depending on the outside air temperature Regulator switch position 0 3 4 5 6 7 8 9 Boiler water temperature C Closed re...

Страница 12: ...atula and a cleaning brush Fig 2 Clean heating surfaces guarantee economical operation of the furnace Furnace should be cleaned at least once a month and in case of higher contamination of the inner s...

Страница 13: ...cost savings in cooking and heating After checking the proper functioning of the furnace and installation open the filling door Fig 1 pos 3 and use the handle to place the top grate Fig 11 b pos 2 in...

Страница 14: ...ct was performed by an unauthorized person that is if unoriginal parts have been embedded if the device has not been properly used in accordance with these guidelines if some mechanical damaging of th...

Отзывы: