Figure 7 Grate shaking Figure 8 Opening of the fixed (vertical) grate
1.
Fixed (vertical) grate
2.
Grate
3.
Auxiliary handling tool
4.
Ash pan
Unpack the furnace and check for all the parts and equipment, especially pay attention to the following:
-
Asbestos-free cord for sealing the hob (Fig. 2, pos. 12) should be spaced equally around the circumference
of the furnace and it should fit perfectly in its channel;
-
Furnace hob (Fig. 1, pos. 2) should be placed over the asbestos-free cord in order to ensure proper sealing;
-
Filing door and kindling door (Fig. 1, pos. 3 and pos. 9) should be equipped with asbestos-free cord that
ensures complete sealing when the door is closed;
-
Fixed (vertical) grate (Fig. 8, pos. 1) should be in its bearing and it should be easy to open;
-
Using control switch on airflow regulator (Fig. 1, pos. 4) should enable easy opening/closing of fly nut on
combustion air intake opening;
-
If it is correctly installed, airflow regulator enables adjusting and automatic maintaining of set water
temperature inside furnace;
-
Remote control thermostat used for measuring the temperature in the boiler (Fig. 1, pos. 6) is properly
installed only if the airflow regulator temperature probe is located in special opening in the front;
-
Grate (Fig. 1, pos. 2) should be placed inside the fire box and it should be connected to grate shaker handle
(Fig. 1, pos. 8) via shaker’s central cog which fits into conical opening on the bottom side of the grate;
-
Chimney pot is factory mounted on the back side, but it could be installed laterally, on the left or on the
right, depending on the position of the furnace compared to the chimney, as well as regard to the
available space;
-
During lateral installation, lateral opening lid should be taken off prior to mounting the chimney pot and
than the lateral opening lid should be used to close the back opening;
-
When mounting, make sure that asbestos-free cord seals completely;
-
Sheet metal for smoke emission direction (Fig. 2, pos. 11) should be placed in accordance to the chimney
pot. If the chimney pot is in the back, than the sheet metal is mounted symmetrically to the furnace (in the
middle), and if it is mounted laterally, than the sheet metal is placed strictly to the lateral side next to the
chimney pot.