3 Installation
Study the instructions carefully and pay special attention to the warnings!
The valve has ends for welding as standard but can also be supplied with fittings.
Step 2
Avoid stressing the valve as this can result in deformation of
the sealing area and misfunction of the valve (leakage or faulty
indication).
Pay special attention to:
-
Vibrations
-
Thermal expansion of the tubes (especially at long tube
lengths)
-
Excessive welding
-
Overloading of the pipelines
NOTE!
Please follow Alfa Laval installation guidelines (literature code
ESE00040).
Risk of damage!
TD 449-241
Step 3
Fittings:
Ensure that the connections are tight.
Remember seal rings!
Step 4
Air connection: R 1/8” (BSP).
AC1: Cleaning of balanced plug.
AC2: Open valve.
AC3: Cleaning of tank plug.
Step 5
CIP connection (optional extra):
1. See description of cleaning - 4.3 Recommended cleaning.
2. Connect CIP correctly
NOTE!
* = Moving parts
Must be open for
inspection!
B = CIP out
C = CIP in
TD 449-251_1
B
C
10
Содержание Unique TO
Страница 2: ......