4 Operation
The installation kits are for cleaning of the leakage chamber when the valve is closed.
The combination of the different kits depends on the actual applications.
CIP = Cleaning In Place
4.4
Cleaning equipment (optional extra)
Step 1
Installation kit A for CIP and leakage connections of a single valve (PVDF/stainless steel tubes)
Contents:
Pos. 1 - Welding male part
Pos. 2 - Fitting PVDF female
Pos. 3 - Tube PVDF
Pos. 4 - Leakage tube AISI 316
TD 430-158_1
Step 2
Installation kit B (inlet) for parallel connection of CIP (PVDF
tubes)
Contents:
Pos. 2 - Fitting PVDF female
Pos. 3 - Tube PVDF
Pos. 5 - Fitting PVDF
TD 430-157_1