
Read the instructions carefully and pay special
attention to the warnings!
2. Installation
0
A
Always
observe the technical data (see
� page18).
The pump
must
be electrically connected
IA by authorized personnel (see the motor
� instructions).
NOTE!
G&H cannot be held responsible for incorrect
installation.
e
Ensure that the flow direction is correct.
e
Risk of damage!
Avoid stressing the pump.
Pay special attention to:
- Vibrations.
- Thermal expansion of the tubes.
- Excessive welding.
- Overloading of the pipelines.
Always check the pump before operation.
- See pre-use check on page 6.
NOTICE:
Please notice that the drawings below only
show the principle.
SEE NOTICE!
Ensure that there is sufficient clearance around
the pump (min. 2 ft).
0
SEE NOTICE!
7
�emember seal
rmgs!
Correct!
Few
bends!
1. Ensure that the pipelines are routed correctly.
2. Ensure that the connections are tight.
CONTACT CSI FOR MORE INFORMATION | CSIDESIGNS.COM | [email protected] | 417.831.1411