
121
3 Dismantling/Assembly
3.6 Major Service (MS), check points
1.
Clean the lock ring thoroughly with a
degreasing agent and wipe it off.
2.
Spray the threads, guide and contact
surfaces with slide lacquer Molykote D321R.
Let the lacquer air-cure for about 15 minutes.
3.
Use a fibre brush to polish the slide lacquer
into the surface. The black spray will look like
well-polished leather when properly finished.
4.
Spray the lock ring a second time and let it
dry for about 15 minutes.
G
0
20
69
1
1
G
0
20
701
1
G
0
2
073
1
1
G
020
72
1
1
Содержание AFPX 617XGV-14/74CG
Страница 1: ...0 5 0 0 E 0 DVcgZTV RZ_eV_R_TV R_fR DVaRcRe c 27AI I8G 48 a SdRc 1 Z ATe...
Страница 6: ...6...
Страница 8: ...8...
Страница 14: ...1 Safety Instructions 14...
Страница 46: ...2 7 Common maintenance directions 2 Maintenance Directions 46...
Страница 52: ...3 2 Intermediate Service IS dismantling 3 Dismantling Assembly 52 3 2 2 Bowl hood and disc stack G0923611...
Страница 103: ...103 3 Dismantling Assembly 3 5 Major Service MS dismantling...
Страница 104: ...3 5 Major Service MS dismantling 3 Dismantling Assembly 104 3 5 2 Vertical driving device G0828551...
Страница 148: ...148...
Страница 150: ...150...
Страница 154: ...154...