DISASSEMBLY PROCEDURES
1. REMOVAL OF TOP AND BOTTOM PANEL (Fig.1)
(A) TAKE OUT THE 8 PCS SCREW FIXING THE KEYBED FROM WHICH THE BOTTOM CHASSIS
(B) TAKE OUT THE 7 PCS NUT OF 1/4”CONNECTORS FROM TOP PANEL
(C) TAKE OUT THE 16 PCS SCREW FROM WHICH THE BOTTOM PANEL
(Fig.1)
2. REMOVAL OF MAIN PCB AND LED PCB (Fig.2)
(A)
REMOVAL THE 2 PCS SCREW FROM WHICH LED PCB
(B)
REMOVAL THE 6 PCS SCREW FROM WHICH MAIN PCB
(C)
REMOVAL THE 8 PCS OF CABLE CONNECTORS FROM MAIN PCB
(Fig.2)
Содержание Micron
Страница 6: ...Confidential Alesis Service Manual 8 31 0147 A ALESIS MICRON Q02 COMPONENTS...
Страница 10: ...WIRING DIAGRAM US EU UK AUS NZ...
Страница 11: ...PACKING DIAGRAM US EU UK AUS NZ...
Страница 12: ...EXPLODE DIAGRAM US EU UK AUS NZ SEQUENCIAL NO OF EXPLODE DIAGRAM WILL BE MARKED ON REF COLUMM OF BOM LIST...
Страница 13: ...Confidential Alesis Service Manual 8 31 0147 A ALESIS MICRON Q02 BOM...
Страница 17: ...Confidential Alesis Service Manual 8 31 0147 A ALESIS MICRON Q02 QC PROCEDURES...
Страница 24: ...Confidential Alesis Service Manual 8 31 0147 A ALESIS MICRON Q02 SCHEMATIC AND PCB FILES...
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ...Confidential Alesis Service Manual 8 31 0147 A ALESIS MICRON Q02 ECN HISTORY...