![ALENCON AID 1000 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/alencon/aid-1000/aid-1000_installation-operation-and-maintenance-manual_2893957007.webp)
Alencon SPOT: Installation,
Operation, and Maintenance Manual
6 |
P a g e
2.4 Packing List
The AID is assembled and tested at the ALENCON factory. Before installation, please ensure
the following items have been shipped:
•
Commensurate # of AID units specified for your project.
•
1 x Warranty Card
•
4 x 1/4"-20 zinc plated slotted indented hex washer head thread cutting screws (for
SPOT/BOSS side mounting option
only
)
F
IGURE
1:
AID
U
NIT
2.5 Ordering Information
See the AID model number and configuration matrix below:
F
IGURE
2:
AID
C
ONFIGURATION
M
ATRIX