Alemite 7338-C Скачать руководство пользователя страница 9

SER 7338-C

Severe-Duty Welding Hose Reel

Revision (12-07)

9

Alemite Corporation

Bench Test

While facing the ratchet on the power spring 

Assembly, turn the reel in a counterclockwise direction 
and allow the ratchet to latch the Pawl.

If the reel does not tension or latch properly, refer to 

the 

Troubleshooting Chart

.

Installation

On the Bench

IMPORTANT: Clean the delivery hose
before attachment to the reel.

  1. Blow any foreign particles from both lines of the 

delivery hose.
• Make sure the hose is clean and dry.

  2. Feed the end of the acetylene/oxygen delivery hose 

through the opening in Sheave Assembly (

16

).

  3. Screw the oxygen hose end (with right-hand threads) 

into Connector (

7

).

  4. Screw the acetylene hose end (with left-hand threads) 

into Connector (

6

) [with notches].

  5. Attach the delivery hose to the Sheave Assembly with 

U-Bolt (

15

), Washers (

13

) and Wing Nuts (

14

).

• Tighten the Wing Nuts securely.

  6. Rotate the Sheave Assembly to wrap the hose onto the 

reel.
• The clicking sound is the power spring bypassing the 

cam on the Spring Arbor.

  7. Screw the acetylene connecting hose [with Teflon 

tape] securely into Swivel Shaft (

1

).

  8. Screw the oxygen connecting hose [with Teflon tape] 

securely into Shaft and Flange Assembly (

41

).

Mount the Reel

IMPORTANT: Should the reel mount to a
ceiling, it is mandatory that the reel be
installed at a height no greater than 20 ' 
(6.1 m) from the floor. Should the existing
ceiling height be greater, mount the reel to a
suspension bracket.

  9. Mount the reel assembly with the appropriate 

hardware.

NOTE

: Make sure the connecting hoses do

not chafe on the reel.

10. Install the torch to the delivery hose.

• Make sure the connections are secure.

11. Install and secure the hose stop to the desired position.

Purge the Delivery Hose

WARNING

Purge the delivery hose in a well ventilated

area.

Personal injury can occur due to explosion.

IMPORTANT: Purge each line of the deliv-
ery hose individually.

12. Turn on the regulator at the acetylene tank and remove 

all the air within the line. 

13. Repeat the process for the oxygen line.

Check for Leaks

14. Apply a soap solution to each connection to ensure no 

leakage occurs.

Setting Spring Tension

CAUTION

Do not overwind the power spring. Too much ten-
sion reduces the life of the spring.

To adjust tension on the power spring:

15. Add / remove one coil of hose to / from the Sheave 

Assembly.

IMPORTANT: Add or remove hose coils to
provide the amount of spring tension that
gently holds the hose stop against the hose
guide. When the hose is fully extended from
the reel, the power spring should be a mini-
mum of 1/2 turn from a fully wound condition.

16. Repeat step 

15

 until the proper tension is achieved.

Содержание 7338-C

Страница 1: ...l injury can occur due to explo sion Hose reel model 7338 C is designed for use on a truck to mount to a ceiling or wall The reel is spring powered and self retracting When the hose is extended the re...

Страница 2: ...SER 7338 C Severe Duty Welding Hose Reel Revision 12 07 2 Alemite Corporation Figure 2 Severe Duty Welding Hose Reel Exploded View...

Страница 3: ...9206 22 22 Spring Wave 1 339207 36 23 Pawl 1 339208 17 24 Shaft Pawl 1 339209 12 25 339243 1 Gasket Spring Case Sponge Rubber 1 339210 21 26 339200 C Spring Assembly Power 1 339211 30 27 171009 44 O R...

Страница 4: ...SER 7338 C Severe Duty Welding Hose Reel Revision 12 07 4 Alemite Corporation...

Страница 5: ...eps 9 11 only if replacing Sheave Assembly 16 or Power Spring Assembly 36 9 Position the Sheave and Power Spring Assembly with the ratchet upward WARNING Do not disassemble the Power Spring Assembly T...

Страница 6: ...rior to assembly certain components require lubrication Refer to Tables 1 and 2 for details Pawl Assembly NOTE Refer to Figures 2 3 and 4 for com ponent identification on assembly proce dures 1 Instal...

Страница 7: ...y in five 5 different positions Select the required relationship of the Guide to the mounting plate of the Base Assembly 14 Secure the Hose Guide Arm to the Base Assembly with Nuts 30 Tighten the Nuts...

Страница 8: ...flon tape is recommended Personal injury can occur due to explosion 27 Screw Hose Connector 6 and 7 with Teflon tape into each Street Elbow 5 as required Tighten each Connector securely 28 Screw each...

Страница 9: ...l IMPORTANT Should the reel mount to a ceiling it is mandatory that the reel be installed at a height no greater than 20 6 1 m from the floor Should the existing ceiling height be greater mount the re...

Страница 10: ...ing on the hose will not release the latch mechanism Should the reel latch in this condition it will be necessary to have an assistant maintain tension on the hose while the latching mechanism is manu...

Страница 11: ...rease power spring pre wind 2 Remove hose slowly when close to being fully extended Fuel leakage at the Swivel Assembly 1 Connection s not sufficiently tight and or Teflon tape missing 2 Worn or damag...

Страница 12: ...Revision 12 07 12 Alemite Corporation SER 7338 C Severe Duty Welding Hose Reel...

Отзывы: