Alemite 7338-C Скачать руководство пользователя страница 8

SER 7338-C

Severe-Duty Welding Hose Reel

Revision (12-07)

8

Alemite Corporation

17. Install and hold Woodruff Key (

43

) into the slot of the 

Assembly.

18. Slide Spring Arbor (

44

) [flat side first] onto the shaft 

and onto the Woodruff Key.

19. Install remaining O-Ring (

41

) into the groove of the 

Shaft and Flange Assembly.

Sheave and Power Spring Assembly

20. Position Sheave Assembly (

16

) Bearing side up.

21. Install Gasket (

25

) onto the Sheave Assembly.

• Make sure to align the notch in the Gasket with the 

alignment mark on the Sheave Assembly. 
See 

Figure 2

.

22. Position Power Spring Assembly (

26

) onto the Sheave 

Assembly.
• Make sure to align the mark on the Power Spring 

with the notch in the Gasket. See 

Figure 2

.

23. Secure the Power Spring Assembly to the Sheave 

Assembly using screws and nuts included with 
Replacement Assembly.
• Make sure the Gasket does not move.
• Make sure the screw heads seat properly into the rib 

of the sheave.

24. Install O-Ring (

27

) into the groove of the Power 

Spring Assembly.

25. Install and seat the Power Spring and Sheave 

Assembly onto the Spring Arbor and Bearing.
• Use care not to damage the O-Rings.
• Make sure the end of the power spring properly 

engages the cam on the Spring Arbor.

• Make sure the ratchet either clears the Pawl or 

engages properly.

26. Install Washer (

12

) and Retaining Ring (

11

) onto the 

Shaft and Flange Assembly.

Swivel Assembly

WARNING

Use a thread sealant that contains no

petroleum-based materials.

Teflon tape is recommended.

Personal injury can occur due to explosion.

27. Screw Hose Connector (

6

 and 

7

) [with Teflon tape] 

into each Street Elbow (

5

) as required.

• Tighten each Connector securely.

28. Screw each Street Elbow assembly [with Teflon tape] 

into Swivel Body (

8

) as required.

• Tighten each Elbow securely.
• Make sure the Elbow orients properly.

29. Install and position each O-Ring (

3

) into the deeper 

grooves on Swivel Shaft (

1

).

• Use care during the installation process.

HINT

: Position the first O-Ring in the first

groove. “Leap-frog” each additional O-Ring
over the previous one(s).

30. Install Bearing (

2

) onto the far end of the Swivel Shaft.

31. Install Bearing (

4

) onto the center of the Shaft.

IMPORTANT: Swivel Body must assemble
onto the Bearings without interference. Any
interference indicates a Bearing is not seated
in its groove.

32. Install the acetylene Swivel Body Assembly (with 

notches in Connector) onto the Shaft.
• Make sure not to damage the O-Rings or the 

Bearings.

• Make sure to orient the Connector properly.

HINT

: Hold each Bearing firmly on the

Shaft when installing the Swivel Body.

33. Install additional Bearing (

2

) onto the Swivel Shaft.

IMPORTANT: Swivel Body must assemble
onto the Bearings without interference. Any
interference indicates a Bearing is not seated
in its groove.

34. Install the oxygen Swivel Body Assembly onto the 

Shaft.
• Use care not to damage the O-Rings or the Bearings.
• Make sure to orient the Connector properly.

35. Install Washer (

9

) and Retaining Ring (

10

) onto the 

Swivel Shaft.

36. Screw the Swivel assembly (with Teflon tape] into the 

Shaft and Flange Assembly.
• Tighten the connection from 23 to 31 ft-lbs

(31 - 42 Nm).

Содержание 7338-C

Страница 1: ...l injury can occur due to explo sion Hose reel model 7338 C is designed for use on a truck to mount to a ceiling or wall The reel is spring powered and self retracting When the hose is extended the re...

Страница 2: ...SER 7338 C Severe Duty Welding Hose Reel Revision 12 07 2 Alemite Corporation Figure 2 Severe Duty Welding Hose Reel Exploded View...

Страница 3: ...9206 22 22 Spring Wave 1 339207 36 23 Pawl 1 339208 17 24 Shaft Pawl 1 339209 12 25 339243 1 Gasket Spring Case Sponge Rubber 1 339210 21 26 339200 C Spring Assembly Power 1 339211 30 27 171009 44 O R...

Страница 4: ...SER 7338 C Severe Duty Welding Hose Reel Revision 12 07 4 Alemite Corporation...

Страница 5: ...eps 9 11 only if replacing Sheave Assembly 16 or Power Spring Assembly 36 9 Position the Sheave and Power Spring Assembly with the ratchet upward WARNING Do not disassemble the Power Spring Assembly T...

Страница 6: ...rior to assembly certain components require lubrication Refer to Tables 1 and 2 for details Pawl Assembly NOTE Refer to Figures 2 3 and 4 for com ponent identification on assembly proce dures 1 Instal...

Страница 7: ...y in five 5 different positions Select the required relationship of the Guide to the mounting plate of the Base Assembly 14 Secure the Hose Guide Arm to the Base Assembly with Nuts 30 Tighten the Nuts...

Страница 8: ...flon tape is recommended Personal injury can occur due to explosion 27 Screw Hose Connector 6 and 7 with Teflon tape into each Street Elbow 5 as required Tighten each Connector securely 28 Screw each...

Страница 9: ...l IMPORTANT Should the reel mount to a ceiling it is mandatory that the reel be installed at a height no greater than 20 6 1 m from the floor Should the existing ceiling height be greater mount the re...

Страница 10: ...ing on the hose will not release the latch mechanism Should the reel latch in this condition it will be necessary to have an assistant maintain tension on the hose while the latching mechanism is manu...

Страница 11: ...rease power spring pre wind 2 Remove hose slowly when close to being fully extended Fuel leakage at the Swivel Assembly 1 Connection s not sufficiently tight and or Teflon tape missing 2 Worn or damag...

Страница 12: ...Revision 12 07 12 Alemite Corporation SER 7338 C Severe Duty Welding Hose Reel...

Отзывы: