background image

QUICK START GUIDE

Power Post

 Monitoring System

Pump Connection Center | Demand Dose, Integrated Alarm

15 Amp, 120/240VAC | Models: PPMS-0001 and PPMS-0002

Safety Guidelines

Step 2: Remove Bottom Cover

Step 4: Installing Wire into WAGO

Before proceeding with the installation or operation of this product, 

read all instructions thoroughly, as well as complying with all federal, 

state and local codes, regulations, and practices. This product must 

be  installed  by  qualified  personnel  familiar  with  all  applicable  local 

electrical and mechanical codes. Refer to the National Electrical Code 

(NFPA 70). Failure to properly install and test this product can result in 

personal injury or equipment malfunction.

WARNING

Step 1: Install Post

Q

SG

00

29

1_

Re

v0

7_

PP

M

S_

Po

we

r P

os

t M

on

ito

rin

g S

ys

te

m | M

ay 2

7, 2

02

2 2

:0

3 P

M

Before making wire connections and terminations, carefully read this 

step for proper functions of both types of WAGO connectors.

WARNING: Improper use of the connectors will cause damage, DO 

NOT use mechanical tools to open or close, hand usage only.

Wire Termination - Splice Connector WAGO (Fig. 1):

  1) Lift tab(s) upward.

  2) Insert wire(s) into slot.

  3) Press tab(s) downward.

  4) Make sure wire(s) are secured.

Wire Connection - Quick Snap Terminal WAGO (Fig. 2):

  1) Press tab(s) outward. DO NOT open past 40° angle

  2) Insert wire(s) into slot.

  3) Press tab(s) inward.

  4) Make sure wire(s) are secured.

Determine location for the post in the 

ground near a tank and drill access 

holes for the float switch cables using 

the customer supplied conduit/fittings or 

Alderon’s riser connection kit. Route the 

cables through access holes and wire as 

described in step 5. Run the direct burial 

power wires underneath the bottom of 

the post as shown in the diagram.

Note: Seal all conduits to prevent moisture and gases 

from entering the post per local codes.

Direct

Burial

Wires

2B

2A

Remove the bottom enclosure cover screw, slide directly downward 

until the sound chamber is cleared (2A) and pull directly away (2B).

Step 3: Remove / Install Post Cap

Remove Post Cap:

  1) Remove Screws and Lift Cap Upwards

Install Post Cap:

  1) Position text FRONT (with arrows) Forward

  3) Align Fastener Holes

  4) Fasten Screws to Secure Cap to Post

(Fig. 1)

(Fig. 2)

TO OPEN

WAGO

TO CLOSE

WAGO

TO OPEN

WAGO

TO CLOSE

WAGO

FRO

NT

Alderon Industries™ |  Patent Pending

Отзывы: