![alcatraz ROCK-1 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/alcatraz/rock-1/rock-1_install-manual_2892402002.webp)
Panel
+12v *
RED
Panel
GND *
BLACK
Panel
D0 / RS485A *
GREEN
Panel
D1 / RS485B *
WHITE
Panel
Beeper
YELLOW
Panel
Tamper
VIOLET
Panel
Hold
BLUE
Panel
LED Green *
ORANGE
Panel
LED Red
BROWN
Badge Reader
+12v *
RED
Badge Reader
GND *
BLACK
Badge Reader
D0 / RS485A *
GREEN
Badge Reader
D1 / RS485B *
WHITE
Badge Reader
Beeper
YELLOW
Badge Reader
Tamper
VIOLET
Badge Reader
Hold
BLUE
Badge Reader
LED Green
ORANGE
Badge Reader
LED Red
BROWN
Wiring Table
Mount 2-gang switch box in wall
Installation to be performed only by certified installer
Power Requirement: PoE+ (802.3at Type 2) 30W
Unit to be powered by UL294B certified IEEE PoE+ 802.3at Type 2
Power Sourcing Equipment using shielded cat5e or higher cable
Wiegand Maximum Cable Length: 500 ft - 22 AWG (152 m), 300 ft - 24
AWG (91 m)
Complies with US FDA performance standards for laser products except for
deviations pursuant to Laser Notice No. 50, dated June 24, 2007
CAUTION: Use of controls or adjustments or performance of procedures other
than those specified herein may result in hazardous radiation exposure
Step 1 –
Installation Prerequisite
Parts Included
1x Alcatraz Rock
1x Wall Mount
1x Wiring Harness
1x Wall release tool
4x Cable Ties
4x Mounting Screws #6-32
Required tools and supplies
2-Gang switch box
Gel filled B connectors or equivalent
22/6 cable, 5-9 conductor, Genesis 12061109 or equivalent (Wiegand)
4 conductor shielded twisted pair, Belden 3107A or equivalent (OSDP)
Level
Measuring tape
Wire stripper / cutter
Phillips screwdriver
Panel Cable
Badge Reader Cable
Install on door opening side
* Required for operation
5ft (1.5m) from floor
1/2” (13mm) minimum
Screw tabs must be in
vertical position
Badge reader
mounted at
standard height
Position close to door
Leave minimum of 1/2”
between 2-gang switch
box and door frame
2-gang
switch box
Содержание ROCK-1
Страница 1: ...The Rock Install Guide...